REVAMP SOLAR CO

How many solar installs has REVAMP SOLAR CO done in California, and which license number is on its installs?

REVAMP SOLAR CO has 51 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Jan 29, 2021 to Jun 17, 2026), most of them in Orange County (20), Los Angeles County (19) and San Bernardino County (7). CSLB lists license 1069078 (REVAMP SOLAR CO) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Sep 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
51
Last 24 months
10
Total capacity
391.2 kW DC
Median system size
7.5 kW DC
With battery storage
25.5% all time; 70.0% last 24 months
Third-party owned
5.9% of 51 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
12 installs, latest Jun 17, 2026
Ownership types recorded
prepaid lease 3
Median battery size
13.5 kWh (13 installs list a capacity)
First install
Jan 29, 2021
Latest install
Jun 17, 2026
Counties
5
Utilities
SCE 51
CSLB license
1069078

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
202160
202241
2023272
202463
202533
2026 (through Aug 31, 2026)54

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

12 of its 51 interconnected installs (23.5% of the 51 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.7% of those include battery storage. The latest Net Billing Tariff install was approved Jun 17, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.03976.5%5 (12.8%)
Net Billing Tariff1223.5%8 (66.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 3 of REVAMP SOLAR CO’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 3, other 0. No residential system in the file lists a third-party owner name that matches REVAMP SOLAR CO exactly.

Third-party owner named on its installsInstalls
Installer name withheld3

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 10 of REVAMP SOLAR CO’s 10 installs name a module maker in the “Generator Manufacturer” fields, and most of those (6, 60.0%) used modules recorded as Hyundai.

In the last 24 months, 10 of REVAMP SOLAR CO’s 10 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (7, 70.0%) used inverters recorded as Tesla.

In the last 24 months, 7 of REVAMP SOLAR CO’s 10 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (7, 100.0%) used batteries recorded as Tesla.

12 of 13 battery-paired PG&E and SCE installs (92.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai66
JA Solar1not in top list
Panasonic1not in top list
Qcells129
United Renewable Energy16
Inverter makerTesla78
Enphase317
Battery makerTesla77

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 49 of 51 installs, inverters on 51. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1069078REVAMP SOLAR CO (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorSep 23, 2020Sep 30, 202851

License numbers are the ones the utilities recorded on the interconnection applications (51 of 51 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1069078. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Orange20
Los Angeles19
San Bernardino7
Riverside4
Ventura1

Top cities

CityInstalls
Fullerton9
Irvine5
Rancho Palos Verdes3
Ontario2
Artesia1
Buena Park1
Cerritos1
Colton1
Covina1
Diamond Bar1
El Monte1
Fontana1
Gardena1
Idyllwild1
La Habra Heights1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
REVAMP SOLAR CO51

Common questions

Where does REVAMP SOLAR CO install solar?

Its installs are spread across 5 counties. The most are in Orange County (20 installs), followed by Los Angeles County (19).

How often does REVAMP SOLAR CO install batteries with solar?

25.5% of its interconnected solar installs include battery storage across all years, and 70.0% in the last 24 months (7 of 10).

How many REVAMP SOLAR CO installs are under NEM 3.0 (the Net Billing Tariff)?

12 of its 51 interconnected installs (23.5% of the 51 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.