RS ENERGY CALIFORNIA

How many solar installs has RS ENERGY CALIFORNIA done in California, and which license number is on its installs?

RS ENERGY CALIFORNIA has 136 residential solar installs interconnected in California, active in the records from 2013 through 2015 (Aug 8, 2013 to Jan 10, 2015), most of them in San Bernardino County (63), Riverside County (57) and Orange County (14). The utilities did not record a CSLB license number on enough of these installs to look one up.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
136
Last 24 months
0
Total capacity
715.1 kW DC
Median system size
5.1 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
ownership not recorded on its installs
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Aug 8, 2013
Latest install
Jan 10, 2015
Counties
5
Utilities
SCE 135, SDGE 1
CSLB license
none reported

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201320
20141330
201510
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 136 interconnected installs with a tariff recorded (136) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0136100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on RS ENERGY CALIFORNIA’s installs. No residential system in the file lists a third-party owner name that matches RS ENERGY CALIFORNIA exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 1 of RS ENERGY CALIFORNIA’s 136 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as Phono Solar Technology.

Across all years, 136 of RS ENERGY CALIFORNIA’s 136 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (75, 55.1%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerPhono Solar Technology01
Inverter makerEnphase075
SMA059
SolarEdge02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1 of 136 installs, inverters on 136. See the methodology and the equipment index.

Contractor license

The utilities did not record a license number for enough of these installs to look one up.

License numbers are the ones the utilities recorded on the interconnection applications (0 of 136 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it.

Counties

CountyInstalls
San Bernardino63
Riverside57
Orange14
Los Angeles1
Ventura1

Top cities

CityInstalls
Murrieta25
Redlands19
Alta Loma10
Cathedral City10
Apple Valley8
Rancho Cucamonga7
Beaumont5
Corona5
Perris5
Victorville4
Loma Linda3
Mentone3
Santa Ana3
Yucaipa3
Chino Hills2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
RS ENERGY CALIFORNIA135
RS Energy California1

Common questions

Where does RS ENERGY CALIFORNIA install solar?

Its installs are spread across 5 counties. The most are in San Bernardino County (63 installs), followed by Riverside County (57).

How often does RS ENERGY CALIFORNIA install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many RS ENERGY CALIFORNIA installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 136 interconnected installs with a tariff recorded (136) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.