Sarita Solar Inc

How many solar installs has Sarita Solar Inc done in California, and which license number is on its installs?

Sarita Solar Inc has 46 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Aug 12, 2022 to Jun 4, 2026), most of them in San Diego County (43), Orange County (2) and Riverside County (1). CSLB lists license 1059767 (SARITA SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Oct 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
46
Last 24 months
16
Total capacity
138.4 kW DC
Median system size
2.3 kW DC
With battery storage
33.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 46 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
33 installs, latest Jun 4, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (1 installs list a capacity)
First install
Aug 12, 2022
Latest install
Jun 4, 2026
Counties
3
Utilities
SDGE 43, SCE 3
CSLB license
1059767

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
202220
2023150
2024190
202580
2026 (through Aug 31, 2026)21

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

33 of its 46 interconnected installs (71.7% of the 46 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Jun 4, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.01328.3%0 (0.0%)
Net Billing Tariff3371.7%1 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Sarita Solar Inc’s installs. No residential system in the file lists a third-party owner name that matches Sarita Solar Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 16 of Sarita Solar Inc’s 16 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (4, 25.0%) used modules recorded as Qcells.

In the last 24 months, 16 of Sarita Solar Inc’s 16 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (13, 81.3%) used inverters recorded as Enphase.

In the last 24 months, 1 of Sarita Solar Inc’s 16 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Tesla.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells419
LONGi33
Silfab35
Canadian Solar29
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.1not in top list
Inverter makerEnphase1342
SMAAmerica22
Tesla11
Battery makerTesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 46 of 46 installs, inverters on 46. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1059767SARITA SOLAR INC (Corporation)CLEARC-46 Solar ContractorOct 30, 2019Oct 31, 202746

License numbers are the ones the utilities recorded on the interconnection applications (46 of 46 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1059767. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Sarita Solar Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20232026Total
unincorporated San Diego County1059767426

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego43
Orange2
Riverside1

Top cities

CityInstalls
San Diego36
Oceanside2
Bonita1
Escondido1
Murrieta1
Orange1
Pine Valley1
Placentia1
San Marcos1
Valley Center1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Sarita Solar Inc43
SARITA SOLAR INC3

Common questions

Where does Sarita Solar Inc install solar?

Its installs are spread across 3 counties. The most are in San Diego County (43 installs), followed by Orange County (2).

How often does Sarita Solar Inc install batteries with solar?

33.3% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (1 of 1). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Sarita Solar Inc installs are under NEM 3.0 (the Net Billing Tariff)?

33 of its 46 interconnected installs (71.7% of the 46 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.