SOLAR ENERGY COLLECTIVE

How many solar installs has SOLAR ENERGY COLLECTIVE done in California, and which license number is on its installs?

SOLAR ENERGY COLLECTIVE has 251 residential solar installs interconnected in California, active in the records from 2017 through 2021 (May 22, 2017 to Apr 27, 2021), most of them in San Joaquin County (125), Contra Costa County (34) and Lake County (14). The license number recorded on most of its installs, 1017319, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
251
Last 24 months
0
Total capacity
1,714.4 kW DC
Median system size
6.3 kW DC
With battery storage
2.4% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 251 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
Median battery size
9.8 kWh (6 installs list a capacity)
First install
May 22, 2017
Latest install
Apr 27, 2021
Counties
28
Utilities
PGE 251
CSLB license
1017319

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
201710
201800
2019490
20201976
202140
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 251 interconnected installs with a tariff recorded (251) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.0251100.0%6 (2.4%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SOLAR ENERGY COLLECTIVE’s installs. No residential system in the file lists a third-party owner name that matches SOLAR ENERGY COLLECTIVE exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 237 of SOLAR ENERGY COLLECTIVE’s 251 installs name a module maker in the “Generator Manufacturer” fields, and most of those (185, 78.1%) used modules recorded as CertainTeed.

Across all years, 250 of SOLAR ENERGY COLLECTIVE’s 251 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (197, 78.8%) used inverters recorded as Enphase.

Across all years, 5 of SOLAR ENERGY COLLECTIVE’s 251 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (5, 100.0%) used batteries recorded as LG.

5 of 6 battery-paired PG&E and SCE installs (83.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCertainTeed0185
Canadian Solar043
Mission Solar03
Qcells02
LONGi01
Inverter makerEnphase0197
SolarEdge052
SMA04
Fronius03
ABB02
Battery makerLG05

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 237 of 251 installs, inverters on 250. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1017319Not found in the CSLB License Master file pulled Nov 4, 2026251

License numbers are the ones the utilities recorded on the interconnection applications (251 of 251 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list SOLAR ENERGY COLLECTIVE’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020Total
City and County of San Francisco10173193104
unincorporated Marin County10173190011

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Joaquin125
Contra Costa34
Lake14
Alameda12
Fresno9
Solano9
Calaveras7
Tuolumne6
Stanislaus5
Merced4
Santa Clara4
Amador2
Madera2
Monterey2
Nevada2
Sutter2
Butte1
El Dorado1
Humboldt1
Kings1
Marin1
Mendocino1
Napa1
Placer1
San Francisco1
Santa Cruz1
Sonoma1
Yolo1

Top cities

CityInstalls
Stockton76
Manteca17
Lakeport10
Tracy10
Antioch9
Acampo5
Brentwood5
Fresno5
Kelseyville4
Oakley4
Ripon4
Valley Springs4
Dublin3
Escalon3
Lathrop3

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLAR ENERGY COLLECTIVE250
Solar Energy Collective1

Common questions

Where does SOLAR ENERGY COLLECTIVE install solar?

Its installs are spread across 28 counties. The most are in San Joaquin County (125 installs), followed by Contra Costa County (34).

How often does SOLAR ENERGY COLLECTIVE install batteries with solar?

2.4% of its interconnected solar installs include battery storage across all years.

How many SOLAR ENERGY COLLECTIVE installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 251 interconnected installs with a tariff recorded (251) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.