SolarQuest

How many solar installs has SolarQuest done in California, and which license number is on its installs?

SolarQuest has 296 residential solar installs interconnected in California, active in the records from 2013 through 2025 (Jul 30, 2013 to Nov 19, 2025), most of them in San Diego County (291) and Orange County (5). CSLB lists license 992252 (SOLARQUEST ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
296
Last 24 months
9
Total capacity
1,801.3 kW DC
Median system size
5.6 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.0% of 258 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
12 installs, latest Nov 19, 2025
Ownership types recorded
none recorded
First install
Jul 30, 2013
Latest install
Nov 19, 2025
Counties
2
Utilities
SDGE 296
CSLB license
992252

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
2013100
2014210
2015230
2016240
2017160
2018230
2019310
2020220
2021210
2022370
2023480
2024140
202560
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

12 of its 296 interconnected installs (4.1% of the 296 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Nov 19, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.06622.3%not counted
NEM 2.021873.6%not recorded
Net Billing Tariff124.1%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SolarQuest’s installs. No residential system in the file lists a third-party owner name that matches SolarQuest exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 9 of SolarQuest’s 9 installs name a module maker in the “Generator Manufacturer” fields, and most of those (5, 55.6%) used modules recorded as Qcells.

In the last 24 months, 9 of SolarQuest’s 9 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (9, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells5115
LONGi4not in top list
Inverter makerEnphase9273

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 295 of 296 installs, inverters on 296. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
992252SOLARQUEST ELECTRIC (Corporation)CLEARC-10 Electrical ContractorApr 21, 2014Apr 30, 2028228

License numbers are the ones the utilities recorded on the interconnection applications (232 of 296 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 992252. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SolarQuest’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192022202320242025Total
unincorporated San Diego County99225242614118

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego291
Orange5

Top cities

CityInstalls
San Diego163
El Cajon16
La Mesa13
Chula Vista12
Oceanside11
Santee11
Vista10
Lakeside8
Spring Valley8
Carlsbad7
Poway5
Ramona5
Escondido4
La Jolla4
Encinitas3

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SolarQuest296

Common questions

Where does SolarQuest install solar?

Its installs are spread across 2 counties. The most are in San Diego County (291 installs), followed by Orange County (5).

How often does SolarQuest install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many SolarQuest installs are under NEM 3.0 (the Net Billing Tariff)?

12 of its 296 interconnected installs (4.1% of the 296 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.