SUNFINITY SOLAR ELECTRIC

How many solar installs has SUNFINITY SOLAR ELECTRIC done in California, and which license number is on its installs?

SUNFINITY SOLAR ELECTRIC has 52 residential solar installs interconnected in California, active in the records from 2019 through 2021 (Oct 4, 2019 to Jul 26, 2021), most of them in Alameda County (9), San Francisco County (8) and Contra Costa County (5). The license number recorded on most of its installs, 1057894, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
52
Last 24 months
0
Total capacity
346.2 kW DC
Median system size
5.4 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
7.7% of 52 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 2, lease 2
First install
Oct 4, 2019
Latest install
Jul 26, 2021
Counties
20
Utilities
PGE 51, SDGE 1
CSLB license
1057894

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
2019240
2020240
202140
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 52 interconnected installs with a tariff recorded (52) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.052100.0%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 4 of SUNFINITY SOLAR ELECTRIC’s installs the utility recorded a third-party ownership type: PPA 2, lease 2, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches SUNFINITY SOLAR ELECTRIC exactly.

Third-party owner named on its installsInstalls
Sunlight Financial LLC2
Sunnova2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 49 of SUNFINITY SOLAR ELECTRIC’s 52 installs name a module maker in the “Generator Manufacturer” fields, and most of those (35, 71.4%) used modules recorded as Qcells.

Across all years, 52 of SUNFINITY SOLAR ELECTRIC’s 52 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (38, 73.1%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells035
JinkoSolar010
Solaria02
Heliene01
LG01
Inverter makerEnphase038
SMA010
SolarEdge04
Fronius01
SunPower01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 49 of 52 installs, inverters on 52. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1057894Not found in the CSLB License Master file pulled Nov 4, 202652

License numbers are the ones the utilities recorded on the interconnection applications (52 of 52 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list SUNFINITY SOLAR ELECTRIC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2020Total
City and County of San Francisco105789411

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Alameda9
San Francisco8
Contra Costa5
San Mateo5
Santa Clara5
Sutter3
San Joaquin2
Solano2
Yuba2
Butte1
Calaveras1
Colusa1
Glenn1
Kern1
Marin1
Monterey1
Nevada1
Placer1
San Diego1
Shasta1

Top cities

CityInstalls
San Francisco8
Fremont5
San Jose3
Yuba City3
Manteca2
Pittsburg2
Plumas Lake2
San Mateo2
Bakersfield1
Benicia1
Campbell1
Chico1
Chula Vista1
Concord1
Daly City1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUNFINITY SOLAR ELECTRIC51
Sunfinity Solar Electric1

Common questions

Where does SUNFINITY SOLAR ELECTRIC install solar?

Its installs are spread across 20 counties. The most are in Alameda County (9 installs), followed by San Francisco County (8).

How often does SUNFINITY SOLAR ELECTRIC install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many SUNFINITY SOLAR ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 52 interconnected installs with a tariff recorded (52) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.