Synergy Home Improvement has 58 residential solar installs interconnected in California, active in the records from 2018 through 2022 (Aug 16, 2018 to Jan 14, 2022), most of them in San Joaquin County (37), Contra Costa County (5) and Fresno County (4). The license number recorded on most of its installs, 710225, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 58
- Last 24 months
- 0
- Total capacity
- 354.6 kW DC
- Median system size
- 5.8 kW DC
- With battery storage
- 0.0% all time; no installs in the last 24 months last 24 months
- Third-party owned
- 0.0% of 58 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- none recorded
- First install
- Aug 16, 2018
- Latest install
- Jan 14, 2022
- Counties
- 12
- Utilities
- PGE 56, SCE 2
- CSLB license
- 710225
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2018 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2018 | 7 | 0 |
| 2019 | 45 | 0 |
| 2020 | 5 | 0 |
| 2021 | 0 | 0 |
| 2022 | 1 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 58 interconnected installs with a tariff recorded (58) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 0 | 0.0% | not counted |
| NEM 2.0 | 58 | 100.0% | 0 (0.0%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on Synergy Home Improvement’s installs. No residential system in the file lists a third-party owner name that matches Synergy Home Improvement exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 51 of Synergy Home Improvement’s 58 installs name a module maker in the “Generator Manufacturer” fields, and most of those (44, 86.3%) used modules recorded as Silfab.
Across all years, 58 of Synergy Home Improvement’s 58 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (56, 96.6%) used inverters recorded as SolarEdge.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Silfab | 0 | 44 |
| S-Energy | 0 | 3 | |
| Mission Solar | 0 | 2 | |
| Axitec | 0 | 1 | |
| Qcells | 0 | 1 | |
| Inverter maker | SolarEdge | 0 | 56 |
| Power-One | 0 | 3 | |
| Enphase | 0 | 2 | |
| Chilicon Power, LLC | 0 | 1 | |
| Fronius | 0 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 51 of 58 installs, inverters on 58. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 710225 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 58 | ||||
License numbers are the ones the utilities recorded on the interconnection applications (58 of 58 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
Local solar permits naming its license
Solar permits in city and county open data that list Synergy Home Improvement’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2019 | Total |
|---|---|---|---|
| unincorporated Marin County | 710225 | 2 | 2 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Other names reported under the same license
- Synergy Home Improvements: 984 installs, license 710225
- Synergy: 45 installs, license 710225
Counties
| County | Installs |
|---|---|
| San Joaquin | 37 |
| Contra Costa | 5 |
| Fresno | 4 |
| Yolo | 3 |
| Tulare | 2 |
| Kings | 1 |
| Madera | 1 |
| Merced | 1 |
| Placer | 1 |
| Solano | 1 |
| Sutter | 1 |
| Yuba | 1 |
Top cities
| City | Installs |
|---|---|
| Manteca | 15 |
| Stockton | 13 |
| Escalon | 7 |
| Woodland | 3 |
| Fresno | 2 |
| Tracy | 2 |
| Visalia | 2 |
| Antioch | 1 |
| Clovis | 1 |
| Concord | 1 |
| Danville | 1 |
| Kingsburg | 1 |
| Lemoore | 1 |
| Madera | 1 |
| Marysville | 1 |
Names as recorded by the utilities
The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Synergy Home Improvement | 58 |
Common questions
Where does Synergy Home Improvement install solar?
Its installs are spread across 12 counties. The most are in San Joaquin County (37 installs), followed by Contra Costa County (5).
How often does Synergy Home Improvement install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years.
How many Synergy Home Improvement installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 58 interconnected installs with a tariff recorded (58) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.