TOPVIEW SOLAR CONSTRUCTION

How many solar installs has TOPVIEW SOLAR CONSTRUCTION done in California, and which license number is on its installs?

TOPVIEW SOLAR CONSTRUCTION has 39 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Mar 23, 2021 to Aug 10, 2026), most of them in Los Angeles County (19), Orange County (6) and Riverside County (5). CSLB lists license 1050213 (TOPVIEW SOLAR CONSTRUCTION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Feb 28, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
39
Last 24 months
10
Total capacity
308.3 kW DC
Median system size
8 kW DC
With battery storage
43.6% all time; 60.0% last 24 months
Third-party owned
0.0% of 39 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
11 installs, latest Aug 10, 2026
Ownership types recorded
none recorded
Median battery size
10.1 kWh (17 installs list a capacity)
First install
Mar 23, 2021
Latest install
Aug 10, 2026
Counties
6
Utilities
SCE 39
CSLB license
1050213

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
202130
20222410
202310
202411
202584
2026 (through Aug 31, 2026)22

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

11 of its 39 interconnected installs (28.2% of the 39 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 63.6% of those include battery storage. The latest Net Billing Tariff install was approved Aug 10, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.02871.8%10 (35.7%)
Net Billing Tariff1128.2%7 (63.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on TOPVIEW SOLAR CONSTRUCTION’s installs. No residential system in the file lists a third-party owner name that matches TOPVIEW SOLAR CONSTRUCTION exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 10 of TOPVIEW SOLAR CONSTRUCTION’s 10 installs name a module maker in the “Generator Manufacturer” fields, and most of those (8, 80.0%) used modules recorded as Silfab.

In the last 24 months, 10 of TOPVIEW SOLAR CONSTRUCTION’s 10 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (5, 50.0%) used inverters recorded as Generac.

In the last 24 months, 6 of TOPVIEW SOLAR CONSTRUCTION’s 10 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (5, 83.3%) used batteries recorded as Generac.

14 of 17 battery-paired PG&E and SCE installs (82.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab89
JA Solar11
Qcells119
Inverter makerGenerac56
SolarEdge416
Tesla12
Battery makerGenerac511
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 33 of 39 installs, inverters on 39. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1050213TOPVIEW SOLAR CONSTRUCTION (Corporation)CLEARB General Building ContractorFeb 14, 2019Feb 28, 202739

License numbers are the ones the utilities recorded on the interconnection applications (39 of 39 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1050213. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles19
Orange6
Riverside5
Ventura5
San Bernardino3
Kern1

Top cities

CityInstalls
Simi Valley3
Lake Forest2
Beaumont1
California City1
Cerritos1
Compton1
Desert Hot Springs1
Downey1
Eastvale1
Fullerton1
Hesperia1
Hidden Hills1
La Crescenta1
Lakewood1
Lawndale1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
TOPVIEW SOLAR CONSTRUCTION39

Common questions

Where does TOPVIEW SOLAR CONSTRUCTION install solar?

Its installs are spread across 6 counties. The most are in Los Angeles County (19 installs), followed by Orange County (6).

How often does TOPVIEW SOLAR CONSTRUCTION install batteries with solar?

43.6% of its interconnected solar installs include battery storage across all years, and 60.0% in the last 24 months (6 of 10).

How many TOPVIEW SOLAR CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?

11 of its 39 interconnected installs (28.2% of the 39 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 63.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.