Advanced Solar Electric, Inc

How many solar installs has Advanced Solar Electric, Inc done in California, and which license number is on its installs?

Advanced Solar Electric, Inc has 300 residential solar installs interconnected in California, active in the records from 2002 through 2016 (Jan 16, 2002 to Sep 30, 2016), most of them in Los Angeles County (123), Ventura County (112) and Santa Barbara County (15). The license number recorded on most of its installs, 806929, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
300
Last 24 months
0
Total capacity
1,580.3 kW DC
Median system size
4.8 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
3.9% of 207 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
other 8
First install
Jan 16, 2002
Latest install
Sep 30, 2016
Counties
15
Utilities
SCE 276, PGE 22, SDGE 2
CSLB license
806929

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2002 to 2026

YearInstalls interconnectedWith battery storage
2002250
200330
2004250
200510
200620
2007330
2008500
20091090
2010320
201190
201230
201320
201400
201540
201620
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 300 interconnected installs with a tariff recorded (300) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0300100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 8 of Advanced Solar Electric, Inc’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 0, other 8. Across all installers, 19 residential systems list a third-party owner name that matches Advanced Solar Electric, Inc exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Advanced Solar Electric4
Anderson, Fred1
SunRun Generation1
SunRun Solar Owner I, LLC1
SunRun Solar Partners 1 LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 27 of Advanced Solar Electric, Inc’s 300 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (12, 44.4%) used modules recorded as SunPower.

Across all years, 298 of Advanced Solar Electric, Inc’s 300 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (179, 60.1%) used inverters recorded as SunPower.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower012
SolarWorld08
Sharp03
BP Solar01
Renesola America01
Inverter makerSunPower0179
SMA067
Advanced Energy, Inc.028
PV Powered014
Xantrex Technology Inc.07

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 27 of 300 installs, inverters on 298. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
806929Not found in the CSLB License Master file pulled Nov 4, 2026274

License numbers are the ones the utilities recorded on the interconnection applications (274 of 300 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles123
Ventura112
Santa Barbara15
Orange14
Riverside9
El Dorado7
San Bernardino6
Contra Costa3
Inyo2
Kern2
Placer2
San Luis Obispo2
Amador1
Fresno1
Madera1

Top cities

CityInstalls
Newbury Park19
Simi Valley19
Thousand Oaks16
Ventura16
Camarillo15
Los Angeles13
Agoura Hills10
Castaic9
Moorpark8
Santa Barbara8
Malibu7
Santa Clarita7
Westlake Village7
Calabasas5
Canyon Country5

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Advanced Solar Electric, Inc184
ADVANCED SOLAR ELECTRIC INC91
Advanced Solar Electric20
Advanced Solar Electric, Inc.3
ADVANCED SOLAR ELECTRIC1
ADVANCED SOLAR ELECTRIC, INC1

Common questions

Where does Advanced Solar Electric, Inc install solar?

Its installs are spread across 15 counties. The most are in Los Angeles County (123 installs), followed by Ventura County (112).

How often does Advanced Solar Electric, Inc install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Advanced Solar Electric, Inc installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 300 interconnected installs with a tariff recorded (300) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.