ADVANCED SOLAR

How many solar installs has ADVANCED SOLAR done in California, and which license number is on its installs?

ADVANCED SOLAR has 665 residential solar installs interconnected in California, active in the records from 2004 through 2026 (Oct 7, 2004 to Mar 18, 2026), most of them in Ventura County (252), Los Angeles County (195) and San Diego County (134). The license number recorded on most of its installs, 806929, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. CSLB lists license 1073380 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Feb 28, 2027, recorded on 142 of its installs.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to ADVANCED SOLAR here carry more than one CSLB license number: 806929 on 522 (not found in the CSLB License Master file) and 1073380 on 142 (CSLB holder Sole owner license (name not shown)), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
665
Last 24 months
22
Total capacity
3,783 kW DC
Median system size
5.2 kW DC
With battery storage
0.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
4.8% of 517 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
25 installs, latest Dec 29, 2025
Ownership types recorded
lease 2, other 23
Median battery size
5 kWh (1 installs list a capacity)
First install
Oct 7, 2004
Latest install
Mar 18, 2026
Counties
8
Utilities
SCE 523, SDGE 142
CSLB license
806929, 1073380

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2004 to 2026

YearInstalls interconnectedWith battery storage
200470
2005330
2006600
2007560
2008420
2009100
2010850
20111230
2012640
2013270
2014150
201500
201600
201700
201800
201900
202000
2021170
2022440
2023560
202480
2025171
2026 (through Aug 31, 2026)10

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

25 of its 665 interconnected installs (3.8% of the 665 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Dec 29, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.052278.5%not counted
NEM 2.011817.7%not recorded
Net Billing Tariff253.8%1 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 25 of ADVANCED SOLAR’s installs the utility recorded a third-party ownership type: PPA 0, lease 2, prepaid lease 0, other 23. No residential system in the file lists a third-party owner name that matches ADVANCED SOLAR exactly.

Third-party owner named on its installsInstalls
Advanced Solar Electric15
Sun Run Generation3
SunRun, Inc2
Harding, Jeff1
SunPower Solar Program l, LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 21 of ADVANCED SOLAR’s 22 installs name a module maker in the “Generator Manufacturer” fields, and most of those (11, 52.4%) used modules recorded as Qcells.

In the last 24 months, 22 of ADVANCED SOLAR’s 22 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (22, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 1 of ADVANCED SOLAR’s 22 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Enphase.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1171
Axitec1012
Inverter makerEnphase22146
Battery makerEnphase11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 132 of 665 installs, inverters on 665. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
806929Not found in the CSLB License Master file pulled Nov 4, 2026522
1073380Sole owner license (name not shown)CLEARC-46 Solar ContractorFeb 16, 2021Feb 28, 2027142

License numbers are the ones the utilities recorded on the interconnection applications (665 of 665 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1073380. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Ventura252
Los Angeles195
San Diego134
Riverside29
Orange28
Santa Barbara13
Kern9
San Bernardino5

Top cities

CityInstalls
Camarillo66
Thousand Oaks47
Newbury Park46
Simi Valley42
El Cajon31
San Diego31
Santa Clarita24
Los Angeles16
Westlake Village16
Agoura Hills15
Canyon Country15
Moorpark15
La Mesa14
Santee13
Valencia13

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ADVANCED SOLAR519
advanced solar142
Advanced Solar4

Common questions

Where does ADVANCED SOLAR install solar?

Its installs are spread across 8 counties. The most are in Ventura County (252 installs), followed by Los Angeles County (195).

How often does ADVANCED SOLAR install batteries with solar?

0.2% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (1 of 1). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many ADVANCED SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?

25 of its 665 interconnected installs (3.8% of the 665 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.