AMERICAN SOLAR ADVANTAGE INC DBA BDH ELECTRICAL CONSTRUCTION

How many solar installs has AMERICAN SOLAR ADVANTAGE INC DBA BDH ELECTRICAL CONSTRUCTION done in California, and which license number is on its installs?

AMERICAN SOLAR ADVANTAGE INC DBA BDH ELECTRICAL CONSTRUCTION has 1,229 residential solar installs interconnected in California, active in the records from 2017 through 2026 (Mar 30, 2017 to Apr 13, 2026), most of them in Riverside County (378), San Bernardino County (357) and Los Angeles County (300). The license number recorded on most of its installs, 1009565, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
1,229
Last 24 months
38
Total capacity
10,218.4 kW DC
Median system size
7.6 kW DC
With battery storage
1.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
22.7% of 1,229 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
16 installs, latest Aug 14, 2024
Ownership types recorded
PPA 228, lease 26, prepaid lease 3, other 22
Median battery size
14.4 kWh (15 installs list a capacity)
First install
Mar 30, 2017
Latest install
Apr 13, 2026
Counties
10
Utilities
SCE 1,161, SDGE 68
CSLB license
1009565

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
201770
2018440
2019530
2020680
2021550
20222685
20235887
20241323
2025120
2026 (through Aug 31, 2026)20

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

16 of its 1,229 interconnected installs (1.3% of the 1,229 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 14, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.030.2%not counted
NEM 2.01,21098.5%15 (1.3%)
Net Billing Tariff161.3%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 279 of AMERICAN SOLAR ADVANTAGE INC DBA BDH ELECTRICAL CONSTRUCTION’s installs the utility recorded a third-party ownership type: PPA 228, lease 26, prepaid lease 3, other 22. Across all installers, 113 residential systems list a third-party owner name that matches AMERICAN SOLAR ADVANTAGE INC DBA BDH ELECTRICAL CONSTRUCTION exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
AMERICAN SOLAR ADVANTAGE INC DBA BDH ELECTRICAL CONSTRUCTION102
Everbright30
Solkraft21
Dividend19
Solwerks Power18

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 35 of AMERICAN SOLAR ADVANTAGE INC DBA BDH ELECTRICAL CONSTRUCTION’s 38 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (15, 42.9%) used modules recorded as SEG Solar.

In the last 24 months, 38 of AMERICAN SOLAR ADVANTAGE INC DBA BDH ELECTRICAL CONSTRUCTION’s 38 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (25, 65.8%) used inverters recorded as Enphase.

In the last 24 months, none of AMERICAN SOLAR ADVANTAGE INC DBA BDH ELECTRICAL CONSTRUCTION’s 38 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

6 of 15 battery-paired PG&E and SCE installs (40.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSEG Solar15322
Znshine9295
Star Solar5not in top list
Qcells480
Boviet Solar Technology2not in top list
Inverter makerEnphase25613
SolarEdge12429
APsystems (Altenergy Power System)1not in top list
Power-One1not in top list
Tesla154
Battery makerEnphase04
LG01
Tesla01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,198 of 1,229 installs, inverters on 1,229. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1009565Not found in the CSLB License Master file pulled Nov 4, 20261,229

License numbers are the ones the utilities recorded on the interconnection applications (1,229 of 1,229 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list AMERICAN SOLAR ADVANTAGE INC DBA BDH ELECTRICAL CONSTRUCTION’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2020202120222023Total
unincorporated San Diego County100956511111225

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Riverside378
San Bernardino357
Los Angeles300
Orange111
San Diego52
Tulare18
Ventura7
Kern3
Kings2
Santa Barbara1

Top cities

CityInstalls
Moreno Valley121
Palmdale82
San Bernardino55
Fontana53
Lancaster43
Corona29
Hemet29
Rialto28
Apple Valley26
Murrieta26
Perris26
Riverside24
Victorville24
Littlerock21
Menifee21

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
AMERICAN SOLAR ADVANTAGE INC DBA BDH ELECTRICAL CONSTRUCTION965
AMERICAN SOLAR ADVANTAGE INC196
AMERICAN SOLAR ADVANTAGE INC DBA BDH ELECTRICAL CO45
American Solar Advantage19
AMERICAN SOLAR ADVANTAGE2
American Solar Advantage, Inc1
AMERICAN SOLAR ADVANTAGE, INC1

Common questions

Where does AMERICAN SOLAR ADVANTAGE INC DBA BDH ELECTRICAL CONSTRUCTION install solar?

Its installs are spread across 10 counties. The most are in Riverside County (378 installs), followed by San Bernardino County (357).

How often does AMERICAN SOLAR ADVANTAGE INC DBA BDH ELECTRICAL CONSTRUCTION install batteries with solar?

1.3% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 36). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many AMERICAN SOLAR ADVANTAGE INC DBA BDH ELECTRICAL CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?

16 of its 1,229 interconnected installs (1.3% of the 1,229 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.