B D H ELECTRICAL CONSTRUCTION

How many solar installs has B D H ELECTRICAL CONSTRUCTION done in California, and which license number is on its installs?

B D H ELECTRICAL CONSTRUCTION has 97 residential solar installs interconnected in California, active in the records from 2021 through 2025 (Jan 18, 2021 to Oct 17, 2025), most of them in Kern County (20), Riverside County (15) and Los Angeles County (14). The license number recorded on most of its installs, 1009565, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
97
Last 24 months
8
Total capacity
802 kW DC
Median system size
7.8 kW DC
With battery storage
1.0% all time; 0.0% last 24 months
Third-party owned
33.0% of 97 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
3 installs, latest Jul 28, 2023
Ownership types recorded
PPA 25, lease 5, other 2
First install
Jan 18, 2021
Latest install
Oct 17, 2025
Counties
20
Utilities
SCE 49, PGE 48
CSLB license
1009565

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
2021490
202220
2023341
202470
202550
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

3 of its 97 interconnected installs (3.1% of the 97 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Jul 28, 2023.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.09496.9%1 (1.1%)
Net Billing Tariff33.1%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 32 of B D H ELECTRICAL CONSTRUCTION’s installs the utility recorded a third-party ownership type: PPA 25, lease 5, prepaid lease 0, other 2. No residential system in the file lists a third-party owner name that matches B D H ELECTRICAL CONSTRUCTION exactly.

Third-party owner named on its installsInstalls
American Solar Advantage INC10
Horizon Solar6
Solkraft5
SOLWERKS3
Premier PPA2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 8 of B D H ELECTRICAL CONSTRUCTION’s 8 installs name a module maker in the “Generator Manufacturer” fields, and most of those (6, 75.0%) used modules recorded as Znshine.

In the last 24 months, 8 of B D H ELECTRICAL CONSTRUCTION’s 8 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (8, 100.0%) used inverters recorded as Enphase.

0 of 1 battery-paired PG&E and SCE installs (0.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerZnshine617
JA Solar1not in top list
SEG Solar17
Inverter makerEnphase864

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 82 of 97 installs, inverters on 97. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1009565Not found in the CSLB License Master file pulled Nov 4, 202697

License numbers are the ones the utilities recorded on the interconnection applications (97 of 97 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list B D H ELECTRICAL CONSTRUCTION’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2020202120222023Total
unincorporated San Diego County100956511111225

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Kern20
Riverside15
Los Angeles14
San Bernardino14
Fresno6
San Joaquin5
Orange4
Contra Costa2
Madera2
Merced2
San Mateo2
Santa Clara2
Ventura2
Amador1
Mariposa1
Napa1
Santa Barbara1
Solano1
Stanislaus1
Sutter1

Top cities

CityInstalls
Bakersfield20
Moreno Valley10
Lancaster4
Apple Valley3
Fontana3
Fresno3
Palmdale3
San Bernardino3
Stockton3
Altadena2
Clovis2
Santa Ana2
Simi Valley2
Sun City2
Antioch1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
B D H ELECTRICAL CONSTRUCTION97

Common questions

Where does B D H ELECTRICAL CONSTRUCTION install solar?

Its installs are spread across 20 counties. The most are in Kern County (20 installs), followed by Riverside County (15).

How often does B D H ELECTRICAL CONSTRUCTION install batteries with solar?

1.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 8).

How many B D H ELECTRICAL CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?

3 of its 97 interconnected installs (3.1% of the 97 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.