AS ELECTRIC INC DBA EVOLUTION ENERGY

How many solar installs has AS ELECTRIC INC DBA EVOLUTION ENERGY done in California, and which license number is on its installs?

AS ELECTRIC INC DBA EVOLUTION ENERGY has 775 residential solar installs interconnected in California, active in the records from 2014 through 2026 (Jan 10, 2014 to Aug 18, 2026), most of them in Los Angeles County (359), Orange County (240) and San Bernardino County (99). CSLB lists license 944493 (EVOLUTION ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Aug 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
775
Last 24 months
200
Total capacity
6,200.9 kW DC
Median system size
8 kW DC
With battery storage
34.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 91.5% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.1% of 740 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
215 installs, latest Aug 18, 2026
Ownership types recorded
lease 1
Median battery size
13.5 kWh (263 installs list a capacity)
First install
Jan 10, 2014
Latest install
Aug 18, 2026
Counties
7
Utilities
SCE 771, PGE 2, SDGE 2
CSLB license
944493

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
2014280
2015140
201610
201700
201800
201971
2020537
2021368
202215920
202322720
20247042
202510399
2026 (through Aug 31, 2026)7766

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

215 of its 775 interconnected installs (27.7% of the 775 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.1% of those include battery storage. The latest Net Billing Tariff install was approved Aug 18, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0435.5%not counted
NEM 2.051766.7%65 (12.6%)
Net Billing Tariff21527.7%198 (92.1%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 1 of AS ELECTRIC INC DBA EVOLUTION ENERGY’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches AS ELECTRIC INC DBA EVOLUTION ENERGY exactly.

Third-party owner named on its installsInstalls
Sunrun1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 200 of AS ELECTRIC INC DBA EVOLUTION ENERGY’s 200 installs name a module maker in the “Generator Manufacturer” fields, and most of those (178, 89.0%) used modules recorded as REC.

In the last 24 months, 200 of AS ELECTRIC INC DBA EVOLUTION ENERGY’s 200 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (98, 49.0%) used inverters recorded as Enphase.

In the last 24 months, 179 of AS ELECTRIC INC DBA EVOLUTION ENERGY’s 200 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (92, 51.4%) used batteries recorded as Tesla.

251 of 263 battery-paired PG&E and SCE installs (95.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC178523
Canadian Solar12not in top list
Hyundai7not in top list
EG42not in top list
Silfab260
Inverter makerEnphase98380
Tesla92109
PointGuard Energy Inc.4not in top list
EG42not in top list
Sol-Ark2not in top list
Battery makerTesla9292
Enphase80140
PointGuard Energy Inc.44
FranklinWH2not in top list
Lithion Battery Inc.1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 716 of 775 installs, inverters on 775. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
944493EVOLUTION ENERGY (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorMar 17, 2010Aug 31, 2028771

License numbers are the ones the utilities recorded on the interconnection applications (771 of 775 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 944493. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list AS ELECTRIC INC DBA EVOLUTION ENERGY’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019202020212022Total
unincorporated San Diego County9444939772126

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles359
Orange240
San Bernardino99
Riverside71
Ventura3
Madera2
San Diego1

Top cities

CityInstalls
Huntington Beach26
Orange22
Chino Hills20
Cerritos19
Eastvale19
Corona18
Long Beach16
Yorba Linda16
Fullerton15
Santa Ana15
San Gabriel14
Torrance13
Tustin13
Glendora12
Monterey Park12

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
AS ELECTRIC INC DBA EVOLUTION ENERGY649
AS ELECTRIC INC83
AS ELECTRIC35
AS Electric8

Common questions

Where does AS ELECTRIC INC DBA EVOLUTION ENERGY install solar?

Its installs are spread across 7 counties. The most are in Los Angeles County (359 installs), followed by Orange County (240).

How often does AS ELECTRIC INC DBA EVOLUTION ENERGY install batteries with solar?

34.0% of its interconnected solar installs include battery storage across all years, and 91.5% in the last 24 months (183 of 200). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many AS ELECTRIC INC DBA EVOLUTION ENERGY installs are under NEM 3.0 (the Net Billing Tariff)?

215 of its 775 interconnected installs (27.7% of the 775 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.