Baker Electric Solar

How many solar installs has Baker Electric Solar done in California, and which license number is on its installs?

Baker Electric Solar has 431 residential solar installs interconnected in California, active in the records from 2009 through 2018 (Mar 16, 2009 to Apr 10, 2018), most of them in Riverside County (362), Orange County (53) and San Bernardino County (10). CSLB lists license 858088 (BAKER HOME ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-20, C-36, C-39, C-46, expires Apr 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
431
Last 24 months
0
Total capacity
3,409.2 kW DC
Median system size
7.4 kW DC
With battery storage
0.2% all time; no installs in the last 24 months last 24 months
Third-party owned
37.6% of 375 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 12, lease 125, prepaid lease 2, other 2
Median battery size
13.5 kWh (1 installs list a capacity)
First install
Mar 16, 2009
Latest install
Apr 10, 2018
Counties
5
Utilities
SCE 431
CSLB license
858088

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200910
201020
201120
2012120
2013480
2014410
2015550
20161390
20171300
201811
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 431 interconnected installs with a tariff recorded (431) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.042698.8%not counted
NEM 2.051.2%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 141 of Baker Electric Solar’s installs the utility recorded a third-party ownership type: PPA 12, lease 125, prepaid lease 2, other 2. Across all installers, 699 residential systems list a third-party owner name that matches Baker Electric Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
sunpower42
Kilowatt Systems, LLC36
SunPower Capital, LLC24
Baker Electric Solar13
Sunnova13

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 296 of Baker Electric Solar’s 431 installs name a module maker in the “Generator Manufacturer” fields, and most of those (162, 54.7%) used modules recorded as LG.

Across all years, 431 of Baker Electric Solar’s 431 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (173, 40.1%) used inverters recorded as SolarEdge.

Across all years, 1 of Baker Electric Solar’s 431 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Tesla.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG0162
SunPower0113
Qcells017
BYD Company01
Sharp01
Inverter makerSolarEdge0173
SunPower0109
SMA081
Enphase043
ABB015
Battery makerTesla01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 296 of 431 installs, inverters on 431. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Baker Electric Solar as developer on 0 battery storage projects and as installer on 72 (0 name it as both), 72 projects in all with 1,136 kWh of storage. 52 have the status Paid, with $273,659 in current incentive allocations. Applications were received from May 1, 2017 to Jan 22, 2020.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid52821$273,659
Cancelled20315$100,438

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage721,136$374,09752$273,659

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
858088BAKER HOME ENERGY (Corporation)CLEARC-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-36; C-39 Roofing Contractor; C-46 Solar ContractorApr 28, 2005Apr 30, 2027397

License numbers are the ones the utilities recorded on the interconnection applications (399 of 431 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 858088. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Baker Electric Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County858088492605389404556556194209903,495

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Riverside362
Orange53
San Bernardino10
Los Angeles5
Kern1

Top cities

CityInstalls
Temecula108
Murrieta102
Menifee27
Winchester27
Wildomar16
Lake Elsinore15
Hemet12
Corona11
Canyon Lake7
Sun City6
Trabuco Canyon6
Yorba Linda6
Cathedral City5
Irvine5
Mission Viejo5

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Baker Electric Solar353
BAKER ELECTRIC SOLAR71
baker electric solar7

Common questions

Where does Baker Electric Solar install solar?

Its installs are spread across 5 counties. The most are in Riverside County (362 installs), followed by Orange County (53).

How often does Baker Electric Solar install batteries with solar?

0.2% of its interconnected solar installs include battery storage across all years.

How many Baker Electric Solar installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 431 interconnected installs with a tariff recorded (431) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.