NB BAKER ELECTRIC INC

How many solar installs has NB BAKER ELECTRIC INC done in California, and which license number is on its installs?

NB BAKER ELECTRIC INC has 280 residential solar installs interconnected in California, active in the records from 2018 through 2023 (May 29, 2018 to Feb 22, 2023), most of them in Riverside County (235), Orange County (23) and San Bernardino County (16). CSLB lists license 858088 (BAKER HOME ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-20, C-36, C-39, C-46, expires Apr 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
280
Last 24 months
0
Total capacity
2,419.8 kW DC
Median system size
8.3 kW DC
With battery storage
15.4% all time; no installs in the last 24 months last 24 months
Third-party owned
1.8% of 280 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 1, lease 3, other 1
Median battery size
13.5 kWh (43 installs list a capacity)
First install
May 29, 2018
Latest install
Feb 22, 2023
Counties
4
Utilities
SCE 280
CSLB license
858088

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
2018776
20198612
20207922
2021363
202210
202310
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 280 interconnected installs with a tariff recorded (280) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.0280100.0%43 (15.4%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 5 of NB BAKER ELECTRIC INC’s installs the utility recorded a third-party ownership type: PPA 1, lease 3, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches NB BAKER ELECTRIC INC exactly.

Third-party owner named on its installsInstalls
Baker Electric Home Energy2
Baker Electric1
Baker Home Energy1
Sunnova1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 280 of NB BAKER ELECTRIC INC’s 280 installs name a module maker in the “Generator Manufacturer” fields, and most of those (263, 93.9%) used modules recorded as LG.

Across all years, 280 of NB BAKER ELECTRIC INC’s 280 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (226, 80.7%) used inverters recorded as SolarEdge.

Across all years, 39 of NB BAKER ELECTRIC INC’s 280 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (36, 92.3%) used batteries recorded as Tesla.

39 of 43 battery-paired PG&E and SCE installs (90.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG0263
Panasonic012
Tesla04
Qcells02
REC02
Inverter makerSolarEdge0226
Enphase032
SunPower014
Huawei Technologies Co., Ltd.03
LG03
Battery makerTesla036
LG03

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 280 of 280 installs, inverters on 280. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names NB BAKER ELECTRIC INC as developer on 0 battery storage projects and as installer on 82 (0 name it as both), 82 projects in all with 1,842 kWh of storage. 72 have the status Paid, with $991,003 in current incentive allocations. Applications were received from Jun 5, 2017 to Oct 14, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid721,552$991,003
Pending Reservation113$30,166
Cancelled9277$186,172

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage42601$142,01139$126,395
Equity Resiliency341,030$990,00530$834,408
Large-Scale Storage5198$45,1593$30,200
Residential Solar and Storage Equity - AB 209113$30,1660$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
858088BAKER HOME ENERGY (Corporation)CLEARC-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-36; C-39 Roofing Contractor; C-46 Solar ContractorApr 28, 2005Apr 30, 2027280

License numbers are the ones the utilities recorded on the interconnection applications (280 of 280 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 858088. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list NB BAKER ELECTRIC INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County858088492605389404556556194209903,495

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Riverside235
Orange23
San Bernardino16
Los Angeles6

Top cities

CityInstalls
Temecula62
Murrieta59
Winchester27
Menifee20
Hemet9
Wildomar8
Corona6
Eastvale6
Yucaipa6
Lake Elsinore5
Romoland5
Beaumont4
Riverside4
Sun City4
Claremont3

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
NB BAKER ELECTRIC INC280

Common questions

Where does NB BAKER ELECTRIC INC install solar?

Its installs are spread across 4 counties. The most are in Riverside County (235 installs), followed by Orange County (23).

How often does NB BAKER ELECTRIC INC install batteries with solar?

15.4% of its interconnected solar installs include battery storage across all years.

How many NB BAKER ELECTRIC INC installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 280 interconnected installs with a tariff recorded (280) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.