Baker Electric Home Energy

How many solar installs has Baker Electric Home Energy done in California, and which license number is on its installs?

Baker Electric Home Energy has 537 residential solar installs interconnected in California, active in the records from 2019 through 2025 (Oct 14, 2019 to Jun 19, 2025), most of them in Riverside County (377), Orange County (98) and San Bernardino County (28). CSLB lists license 858088 (BAKER HOME ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-20, C-36, C-39, C-46, expires Apr 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
537
Last 24 months
32
Total capacity
5,006.6 kW DC
Median system size
8.6 kW DC
With battery storage
32.5% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 90.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
3.2% of 537 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
41 installs, latest Jun 19, 2025
Ownership types recorded
PPA 9, other 8
Median battery size
13.5 kWh (170 installs list a capacity)
First install
Oct 14, 2019
Latest install
Jun 19, 2025
Counties
7
Utilities
SCE 516, SDGE 14, PGE 7
CSLB license
858088

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201921
202010
20218228
202223156
202315129
20245542
20251514
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

41 of its 537 interconnected installs (7.6% of the 537 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 97.6% of those include battery storage. The latest Net Billing Tariff install was approved Jun 19, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.049692.4%130 (27.0%)
Net Billing Tariff417.6%40 (97.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 17 of Baker Electric Home Energy’s installs the utility recorded a third-party ownership type: PPA 9, lease 0, prepaid lease 0, other 8. Across all installers, 3 residential systems list a third-party owner name that matches Baker Electric Home Energy exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Baker Home Energy8
SunRun5
Enfin-PPA2
Baker Electric Home Energy1
SUNNOVA1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 32 of Baker Electric Home Energy’s 32 installs name a module maker in the “Generator Manufacturer” fields, and most of those (19, 59.4%) used modules recorded as Qcells.

In the last 24 months, 32 of Baker Electric Home Energy’s 32 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (20, 62.5%) used inverters recorded as Tesla.

In the last 24 months, 28 of Baker Electric Home Energy’s 32 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (23, 82.1%) used batteries recorded as Tesla.

160 of 170 battery-paired PG&E and SCE installs (94.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells19182
Canadian Solar58
REC585
LG3212
LONGi1not in top list
Inverter makerTesla2049
Enphase10190
SolarEdge2200
Battery makerTesla23125
sonnen322
Enphase29

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 509 of 537 installs, inverters on 537. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Baker Electric Home Energy as developer on 0 battery storage projects and as installer on 12 (0 name it as both), 12 projects in all with 251 kWh of storage. 11 have the status Paid, with $52,619 in current incentive allocations. Applications were received from Jan 11, 2018 to Nov 24, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid11224$52,619
RRF Rejected126$3,960

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage10172$41,01910$41,019
Large-Scale Storage153$11,6001$11,600
Not stated126$3,9600$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
858088BAKER HOME ENERGY (Corporation)CLEARC-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-36; C-39 Roofing Contractor; C-46 Solar ContractorApr 28, 2005Apr 30, 2027537

License numbers are the ones the utilities recorded on the interconnection applications (537 of 537 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 858088. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Baker Electric Home Energy’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County858088492605389404556556194209903,495

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Riverside377
Orange98
San Bernardino28
Los Angeles14
San Diego13
Lake5
Mendocino2

Top cities

CityInstalls
Temecula115
Murrieta76
Menifee45
Corona30
Winchester18
Hemet16
Mission Viejo14
Lake Elsinore13
Huntington Beach10
Wildomar10
Santa Ana9
Sun City8
Laguna Beach7
Lake Forest7
Newport Beach7

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Baker Electric Home Energy280
BAKER ELECTRIC HOME ENERGY257

Common questions

Where does Baker Electric Home Energy install solar?

Its installs are spread across 7 counties. The most are in Riverside County (377 installs), followed by Orange County (98).

How often does Baker Electric Home Energy install batteries with solar?

32.5% of its interconnected solar installs include battery storage across all years, and 90.6% in the last 24 months (29 of 32). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Baker Electric Home Energy installs are under NEM 3.0 (the Net Billing Tariff)?

41 of its 537 interconnected installs (7.6% of the 537 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 97.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.