CALIFORNIA STATE DEVELOPMENT

How many solar installs has CALIFORNIA STATE DEVELOPMENT done in California, and which license number is on its installs?

CALIFORNIA STATE DEVELOPMENT has 98 residential solar installs interconnected in California, active in the records from 2020 through 2025 (Dec 28, 2020 to Mar 21, 2025), most of them in Los Angeles County (26), Orange County (25) and Riverside County (21). The license number recorded on most of its installs, 1049108, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
98
Last 24 months
4
Total capacity
892.4 kW DC
Median system size
8.7 kW DC
With battery storage
4.1% all time; 25.0% last 24 months
Third-party owned
1.0% of 98 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
3 installs, latest Mar 21, 2025
Ownership types recorded
PPA 1
Median battery size
14.2 kWh (4 installs list a capacity)
First install
Dec 28, 2020
Latest install
Mar 21, 2025
Counties
8
Utilities
SCE 97, PGE 1
CSLB license
1049108

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
202010
202170
2022132
2023610
2024131
202531
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

3 of its 98 interconnected installs (3.1% of the 98 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.7% of those include battery storage. The latest Net Billing Tariff install was approved Mar 21, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.09596.9%2 (2.1%)
Net Billing Tariff33.1%2 (66.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of CALIFORNIA STATE DEVELOPMENT’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches CALIFORNIA STATE DEVELOPMENT exactly.

Third-party owner named on its installsInstalls
Solkraft1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 3 of CALIFORNIA STATE DEVELOPMENT’s 4 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 66.7%) used modules recorded as Qcells.

In the last 24 months, 4 of CALIFORNIA STATE DEVELOPMENT’s 4 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (2, 50.0%) used inverters recorded as Enphase.

In the last 24 months, none of CALIFORNIA STATE DEVELOPMENT’s 4 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

1 of 4 battery-paired PG&E and SCE installs (25.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells262
Panasonic1not in top list
Inverter makerEnphase253
Panasonic1not in top list
SolarEdge125
Battery makerEnphase01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 97 of 98 installs, inverters on 98. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names CALIFORNIA STATE DEVELOPMENT as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 17 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Jul 26, 2021 to Jul 26, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled117$16,788

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency117$16,7880$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1049108Not found in the CSLB License Master file pulled Nov 4, 202698

License numbers are the ones the utilities recorded on the interconnection applications (98 of 98 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list CALIFORNIA STATE DEVELOPMENT’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2022Total
unincorporated San Diego County104910822

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles26
Orange25
Riverside21
San Bernardino16
Ventura6
Kern2
Napa1
Santa Barbara1

Top cities

CityInstalls
Moreno Valley6
Rialto4
Apple Valley3
Brea3
Corona3
Pomona3
Costa Mesa2
Fontana2
Fullerton2
Lake Forest2
Lancaster2
Monrovia2
Murrieta2
Norco2
Perris2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CALIFORNIA STATE DEVELOPMENT98

Common questions

Where does CALIFORNIA STATE DEVELOPMENT install solar?

Its installs are spread across 8 counties. The most are in Los Angeles County (26 installs), followed by Orange County (25).

How often does CALIFORNIA STATE DEVELOPMENT install batteries with solar?

4.1% of its interconnected solar installs include battery storage across all years, and 25.0% in the last 24 months (1 of 4).

How many CALIFORNIA STATE DEVELOPMENT installs are under NEM 3.0 (the Net Billing Tariff)?

3 of its 98 interconnected installs (3.1% of the 98 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.