Capital Remodel & Design, Inc.

How many solar installs has Capital Remodel & Design, Inc. done in California, and which license number is on its installs?

Capital Remodel & Design, Inc. has 348 residential solar installs interconnected in California, active in the records from 2013 through 2026 (Sep 14, 2013 to May 12, 2026), most of them in San Joaquin County (232), Calaveras County (31) and Stanislaus County (26). CSLB lists license 873535 (FIVE STAR SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires May 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
348
Last 24 months
2
Total capacity
2,742.4 kW DC
Median system size
7.2 kW DC
With battery storage
0.9% all time; 100.0% last 24 months
Third-party owned
0.3% of 348 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 1
First install
Sep 14, 2013
Latest install
May 12, 2026
Counties
18
Utilities
PGE 346, SCE 2
CSLB license
873535

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201330
2014130
2015120
2016200
2017170
2018500
2019680
2020821
2021780
202210
202320
202400
202500
2026 (through Aug 31, 2026)22

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 348 interconnected installs with a tariff recorded (348) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.05014.4%not counted
NEM 2.029885.6%1 (0.3%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of Capital Remodel & Design, Inc.’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Capital Remodel & Design, Inc. exactly.

Third-party owner named on its installsInstalls
SUNNOVA1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 2 of Capital Remodel & Design, Inc.’s 2 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used modules recorded as Qcells.

In the last 24 months, 2 of Capital Remodel & Design, Inc.’s 2 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (1, 50.0%) used inverters recorded as ABB.

In the last 24 months, 2 of Capital Remodel & Design, Inc.’s 2 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (1, 50.0%) used batteries recorded as Enphase.

3 of 3 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells2not in top list
REC112
SunPower1not in top list
Inverter makerABB11
Enphase192
SMA152
Tesla1not in top list
Battery makerEnphase12
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 347 of 348 installs, inverters on 347. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Capital Remodel & Design, Inc. as developer on 8 battery storage projects and as installer on 6 (6 name it as both), 8 projects in all with 137 kWh of storage. 4 have the status Paid, with $28,545 in current incentive allocations. Applications were received from Feb 1, 2021 to Nov 5, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid480$28,545
Cancelled350$40,141
RRF Rejected17$971

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage471$11,0753$9,133
Equity Resiliency247$46,6121$19,412
Residential Storage Equity113$11,0000$0
Not stated17$9710$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
873535FIVE STAR SOLAR (Corporation)CLEARB General Building Contractor; C-46 Solar ContractorFeb 28, 2006May 31, 2028343

License numbers are the ones the utilities recorded on the interconnection applications (343 of 348 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 873535. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
San Joaquin232
Calaveras31
Stanislaus26
Solano13
Yolo9
Contra Costa8
Placer8
Alameda7
Tuolumne3
Merced2
Sutter2
Los Angeles1
Marin1
Nevada1
Orange1
Sacramento1
San Mateo1
Santa Clara1

Top cities

CityInstalls
Stockton95
Manteca48
Tracy44
Oakdale18
Copperopolis15
Ripon12
Acampo10
Lathrop8
Riverbank7
Valley Springs7
Livermore6
Vacaville6
Lodi5
Rocklin5
Lockeford4

Names as recorded by the utilities

The utilities recorded this installer under 16 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CAPITAL REMODEL & DESIGN INC200
Capital Remodel & Design, Inc.75
Capital Remodel & Design Inc18
CAPITAL REMODEL & DESIGN17
capital remodel & design Inc14
Capital Remodel & Design7
CAPITAL REMODEL&DESIGN5
Capital Remodel and Design Inc. DBA Five Star Solar3
CAPITAL REMODEL & DESIGN INC DBA FIVE STAR SOLAR2
capital Remodel & design1
capital remodel & design inc1
capital remodel & Design Inc1
Capital Remodel & Design Inc.1
Capital Remodel and Design1
CAPITAL REMODEL AND DESIGN1
CAPITAL REMODEL& DESIGN INC1

Common questions

Where does Capital Remodel & Design, Inc. install solar?

Its installs are spread across 18 counties. The most are in San Joaquin County (232 installs), followed by Calaveras County (31).

How often does Capital Remodel & Design, Inc. install batteries with solar?

0.9% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (2 of 2).

How many Capital Remodel & Design, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 348 interconnected installs with a tariff recorded (348) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.