CleanTech Energy Solutions, Inc.

How many solar installs has CleanTech Energy Solutions, Inc. done in California, and which license number is on its installs?

CleanTech Energy Solutions, Inc. has 148 residential solar installs interconnected in California, active in the records from 2003 through 2026 (Jul 30, 2003 to Aug 3, 2026), most of them in San Diego County (144), Orange County (3) and Riverside County (1). CSLB lists license 910460 (CLEANTECH ENERGY SOLUTIONS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Feb 29, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
148
Last 24 months
17
Total capacity
1,255.3 kW DC
Median system size
6.4 kW DC
With battery storage
100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 103 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
13 installs, latest Aug 3, 2026
Ownership types recorded
none recorded
Median battery size
13.6 kWh (1 installs list a capacity)
First install
Jul 30, 2003
Latest install
Aug 3, 2026
Counties
3
Utilities
SDGE 147, SCE 1
CSLB license
910460

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2003 to 2026

YearInstalls interconnectedWith battery storage
200320
200440
200510
200610
200700
200810
200960
201060
201160
201270
201360
201430
201550
201660
201750
201850
2019110
202080
202180
2022140
2023210
2024100
2025111
2026 (through Aug 31, 2026)10

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

13 of its 148 interconnected installs (8.8% of the 148 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Aug 3, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.05235.1%not counted
NEM 2.08356.1%1 (100.0%)
Net Billing Tariff138.8%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on CleanTech Energy Solutions, Inc.’s installs. No residential system in the file lists a third-party owner name that matches CleanTech Energy Solutions, Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 17 of CleanTech Energy Solutions, Inc.’s 17 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (5, 29.4%) used modules recorded as Silfab.

In the last 24 months, 17 of CleanTech Energy Solutions, Inc.’s 17 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (8, 47.1%) used inverters recorded as Enphase.

In the last 24 months, 1 of CleanTech Energy Solutions, Inc.’s 17 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as FranklinWH.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab524
JA Solar3not in top list
Qcells36
Aptos Solar2not in top list
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.2not in top list
Inverter makerEnphase861
SolarEdge546
PointGuardEnergyInc.44
Battery makerFranklinWH11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 123 of 148 installs, inverters on 130. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
910460CLEANTECH ENERGY SOLUTIONS INC (Corporation)CLEARC-46 Solar ContractorFeb 8, 2008Feb 29, 202896

License numbers are the ones the utilities recorded on the interconnection applications (96 of 148 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 910460. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list CleanTech Energy Solutions, Inc.’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County91046053211321119

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego144
Orange3
Riverside1

Top cities

CityInstalls
San Diego37
Escondido21
Oceanside17
Encinitas9
Carlsbad8
La Jolla8
Vista8
El Cajon6
Chula Vista5
Solana Beach4
Bonita3
La Mesa3
Del Mar2
Lakeside2
Ramona2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CleanTech Energy Solutions, Inc.147
CLEANTECH ENERGY SOLUTIONS INC1

Common questions

Where does CleanTech Energy Solutions, Inc. install solar?

Its installs are spread across 3 counties. The most are in San Diego County (144 installs), followed by Orange County (3).

How often does CleanTech Energy Solutions, Inc. install batteries with solar?

100.0% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (1 of 1). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many CleanTech Energy Solutions, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

13 of its 148 interconnected installs (8.8% of the 148 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.