Ecosolar USA

How many solar installs has Ecosolar USA done in California, and which license number is on its installs?

Ecosolar USA has 128 residential solar installs interconnected in California, active in the records from 2018 through 2020 (Mar 12, 2018 to May 27, 2020), most of them in Orange County (91), Los Angeles County (19) and Riverside County (8). The license number recorded on most of its installs, 1008302, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
128
Last 24 months
0
Total capacity
938.8 kW DC
Median system size
6.9 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
12.5% of 128 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 16
First install
Mar 12, 2018
Latest install
May 27, 2020
Counties
5
Utilities
SCE 128
CSLB license
1008302

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
2018430
2019840
202010
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 128 interconnected installs with a tariff recorded (128) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.0128100.0%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 16 of Ecosolar USA’s installs the utility recorded a third-party ownership type: PPA 0, lease 16, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Ecosolar USA exactly.

Third-party owner named on its installsInstalls
SUNPOWER13
LIFESTYLE3

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 128 of Ecosolar USA’s 128 installs name a module maker in the “Generator Manufacturer” fields, and most of those (120, 93.8%) used modules recorded as SunPower.

Across all years, 128 of Ecosolar USA’s 128 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (120, 93.8%) used inverters recorded as SunPower.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower0120
Qcells06
Silfab02
Inverter makerSunPower0120
SolarEdge07
Enphase01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 128 of 128 installs, inverters on 128. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1008302Not found in the CSLB License Master file pulled Nov 4, 2026119

License numbers are the ones the utilities recorded on the interconnection applications (128 of 128 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list Ecosolar USA’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018Total
unincorporated San Diego County100830211

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Orange91
Los Angeles19
Riverside8
San Bernardino8
Ventura2

Top cities

CityInstalls
Garden Grove20
Westminster15
Santa Ana13
Fountain Valley11
Irvine7
Orange7
Huntington Beach5
Long Beach5
Corona4
Tustin3
Buena Park2
Fullerton2
Lake Forest2
Riverside2
San Bernardino2

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ECOSOLAR USA105
Ecosolar USA21
EcoSolar Usa1
EcoSolar USA1

Common questions

Where does Ecosolar USA install solar?

Its installs are spread across 5 counties. The most are in Orange County (91 installs), followed by Los Angeles County (19).

How often does Ecosolar USA install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Ecosolar USA installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 128 interconnected installs with a tariff recorded (128) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.