GALKOS

How many solar installs has GALKOS done in California, and which license number is on its installs?

GALKOS has 1,370 residential solar installs interconnected in California, active in the records from 2010 through 2015 (Jul 21, 2010 to Mar 24, 2015), most of them in Los Angeles County (368), Riverside County (364) and Orange County (302). The license number recorded on most of its installs, 492715, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
1,370
Last 24 months
0
Total capacity
4,342.3 kW DC
Median system size
2.5 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
26.4% of 1,113 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 166, lease 127, other 1
First install
Jul 21, 2010
Latest install
Mar 24, 2015
Counties
9
Utilities
SCE 1,370
CSLB license
492715

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
20101530
20115830
20124820
20131060
2014260
2015200
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 1,370 interconnected installs with a tariff recorded (1,370) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01,370100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 294 of GALKOS’s installs the utility recorded a third-party ownership type: PPA 166, lease 127, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches GALKOS exactly.

Third-party owner named on its installsInstalls
MYSOLAR I, LLC85
GREENDAY FINANCE I, LLC76
PV HOME, PPA1, LLC47
PVHOME PPA 1, LLC27
PV HOME PPA 1, LLC17

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 1,370 of GALKOS’ 1,370 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1,343, 98.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Inverter makerEnphase01,343
SMA020
Advanced Energy, Inc.09
SunPower05
Fronius01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 0 of 1,370 installs, inverters on 1,370. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
492715Not found in the CSLB License Master file pulled Nov 4, 20261,370

License numbers are the ones the utilities recorded on the interconnection applications (1,370 of 1,370 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles368
Riverside364
Orange302
San Bernardino167
Tulare92
Kern44
Ventura27
Kings5
Santa Barbara1

Top cities

CityInstalls
Murrieta54
Corona49
Temecula48
Lancaster36
Huntington Beach34
Visalia26
Fountain Valley23
Fullerton23
Long Beach23
Orange23
Porterville23
Whittier23
Norco21
Hemet20
Moreno Valley20

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GALKOS1,370

Common questions

Where does GALKOS install solar?

Its installs are spread across 9 counties. The most are in Los Angeles County (368 installs), followed by Riverside County (364).

How often does GALKOS install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many GALKOS installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 1,370 interconnected installs with a tariff recorded (1,370) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.