GIGAWATT CALIFORNIA LLC

How many solar installs has GIGAWATT CALIFORNIA LLC done in California, and which license number is on its installs?

GIGAWATT CALIFORNIA LLC has 58 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Dec 16, 2024 to May 6, 2026), most of them in Los Angeles County (24), Riverside County (18) and San Bernardino County (8). CSLB lists license 1108480 (SOL-UP) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Aug 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
58
Last 24 months
58
Total capacity
504.8 kW DC
Median system size
7.8 kW DC
With battery storage
93.1% all time; 93.1% last 24 months
Third-party owned
10.3% of 58 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
58 installs, latest May 6, 2026
Ownership types recorded
PPA 5, lease 1
Median battery size
13.5 kWh (54 installs list a capacity)
First install
Dec 16, 2024
Latest install
May 6, 2026
Counties
10
Utilities
SCE 53, PGE 5
CSLB license
1108480

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
202411
20253533
2026 (through Aug 31, 2026)2220

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

58 of its 58 interconnected installs (100.0% of the 58 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.1% of those include battery storage. The latest Net Billing Tariff install was approved May 6, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.000.0%0
Net Billing Tariff58100.0%54 (93.1%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 6 of GIGAWATT CALIFORNIA LLC’s installs the utility recorded a third-party ownership type: PPA 5, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches GIGAWATT CALIFORNIA LLC exactly.

Third-party owner named on its installsInstalls
GoodLeap. LLC3
Lightreach2
Palmetto Lightreach1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 58 of GIGAWATT CALIFORNIA LLC’s 58 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (21, 36.2%) used modules recorded as REC.

In the last 24 months, 58 of GIGAWATT CALIFORNIA LLC’s 58 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (46, 79.3%) used inverters recorded as Tesla.

In the last 24 months, 52 of GIGAWATT CALIFORNIA LLC’s 58 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (48, 92.3%) used batteries recorded as Tesla.

52 of 54 battery-paired PG&E and SCE installs (96.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC2121
Meyer Burger1414
JA Solar1313
Axitec22
Canadian Solar22
Inverter makerTesla4646
SolarEdge88
Enphase22
APsystems (Altenergy Power System)11
Delta Electronics11
Battery makerTesla4848
SolarEdge44
Enphase11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 58 of 58 installs, inverters on 58. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1108480SOL-UP (Limited Liability)CLEARC-10 Electrical ContractorAug 10, 2023Aug 31, 202758

License numbers are the ones the utilities recorded on the interconnection applications (58 of 58 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1108480. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list GIGAWATT CALIFORNIA LLC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2025Total
unincorporated San Diego County110848022

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Los Angeles24
Riverside18
San Bernardino8
Sonoma2
El Dorado1
Kern1
Orange1
Placer1
Solano1
Ventura1

Top cities

CityInstalls
Palm Springs4
Beaumont2
Canyon Country2
Desert Hot Springs2
Glendora2
Hemet2
Lancaster2
Monrovia2
Newhall2
Ontario2
Santa Clarita2
Alta Loma1
Baldwin Park1
California City1
Castaic1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GIGAWATT CALIFORNIA LLC58

Common questions

Where does GIGAWATT CALIFORNIA LLC install solar?

Its installs are spread across 10 counties. The most are in Los Angeles County (24 installs), followed by Riverside County (18).

How often does GIGAWATT CALIFORNIA LLC install batteries with solar?

93.1% of its interconnected solar installs include battery storage across all years, and 93.1% in the last 24 months (54 of 58).

How many GIGAWATT CALIFORNIA LLC installs are under NEM 3.0 (the Net Billing Tariff)?

58 of its 58 interconnected installs (100.0% of the 58 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.