Go Solar Easy

How many solar installs has Go Solar Easy done in California, and which license number is on its installs?

Go Solar Easy has 62 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Dec 30, 2022 to Jan 13, 2026), most of them in San Bernardino County (19), Los Angeles County (16) and Orange County (12). CSLB lists license 1087436 (GO SOLAR EASY INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Feb 29, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
62
Last 24 months
9
Total capacity
504.5 kW DC
Median system size
8.2 kW DC
With battery storage
9.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 55.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
3.2% of 62 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
2 installs, latest Nov 3, 2025
Ownership types recorded
PPA 2
Median battery size
13.5 kWh (5 installs list a capacity)
First install
Dec 30, 2022
Latest install
Jan 13, 2026
Counties
6
Utilities
SCE 54, SDGE 8
CSLB license
1087436

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
202220
2023440
202490
202553
2026 (through Aug 31, 2026)22

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

2 of its 62 interconnected installs (3.2% of the 62 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Nov 3, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.06096.8%3 (5.8%)
Net Billing Tariff23.2%2 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 2 of Go Solar Easy’s installs the utility recorded a third-party ownership type: PPA 2, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Go Solar Easy exactly.

Third-party owner named on its installsInstalls
Lighreach Palmetto Solar1
LIGHTREACH PALMETTO SOLAR1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 9 of Go Solar Easy’s 9 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (3, 33.3%) used modules recorded as Qcells.

In the last 24 months, 9 of Go Solar Easy’s 9 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (4, 44.4%) used inverters recorded as Enphase.

In the last 24 months, 5 of Go Solar Easy’s 9 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (3, 60.0%) used batteries recorded as Tesla.

5 of 5 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells326
REC213
Hyundai1not in top list
Silfab1not in top list
SunPower1not in top list
Inverter makerEnphase438
SolarEdge416
SunPower13
Tesla12
Battery makerTesla33
SolarEdge22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 62 of 62 installs, inverters on 62. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Go Solar Easy as developer on 23 battery storage projects and as installer on 10 (10 name it as both), 23 projects in all with 648 kWh of storage. 6 have the status Paid, with $167,100 in current incentive allocations. Applications were received from Oct 20, 2021 to Jul 2, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid6199$167,100
Reserved12317$316,800
Cancelled5132$132,000

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency22607$607,2005$158,400
Large-Scale Storage141$8,7001$8,700

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1087436GO SOLAR EASY INC (Corporation)CLEARC-10 Electrical ContractorFeb 18, 2022Feb 29, 202862

License numbers are the ones the utilities recorded on the interconnection applications (62 of 62 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1087436. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Go Solar Easy’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2023Total
unincorporated San Diego County108743611

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Bernardino19
Los Angeles16
Orange12
Riverside9
San Diego5
Ventura1

Top cities

CityInstalls
Alta Loma3
Buena Park2
Chino2
Fullerton2
Huntington Beach2
Laguna Niguel2
Palm Desert2
San Bernardino2
Temecula2
Adelanto1
Agoura Hills1
Alhambra1
Apple Valley1
Baldwin Park1
Bellflower1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GO SOLAR EASY INC54
Go Solar Easy8

Common questions

Where does Go Solar Easy install solar?

Its installs are spread across 6 counties. The most are in San Bernardino County (19 installs), followed by Los Angeles County (16).

How often does Go Solar Easy install batteries with solar?

9.3% of its interconnected solar installs include battery storage across all years, and 55.6% in the last 24 months (5 of 9). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Go Solar Easy installs are under NEM 3.0 (the Net Billing Tariff)?

2 of its 62 interconnected installs (3.2% of the 62 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.