Gold Coast Solar Inc

How many solar installs has Gold Coast Solar Inc done in California, and which license number is on its installs?

Gold Coast Solar Inc has 345 residential solar installs interconnected in California, active in the records from 2017 through 2026 (Sep 27, 2017 to May 14, 2026), most of them in San Diego County (94), Riverside County (73) and Los Angeles County (64). The license number recorded on most of its installs, 1021508, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
345
Last 24 months
6
Total capacity
2,958.3 kW DC
Median system size
7.3 kW DC
With battery storage
3.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 345 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
2 installs, latest May 14, 2026
Ownership types recorded
none recorded
Median battery size
9.8 kWh (8 installs list a capacity)
First install
Sep 27, 2017
Latest install
May 14, 2026
Counties
7
Utilities
SCE 235, SDGE 110
CSLB license
1021508

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
201740
2018401
2019751
2020672
2021400
2022563
2023501
202480
202520
2026 (through Aug 31, 2026)30

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

2 of its 345 interconnected installs (0.6% of the 345 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved May 14, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.034399.4%8 (3.4%)
Net Billing Tariff20.6%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Gold Coast Solar Inc’s installs. No residential system in the file lists a third-party owner name that matches Gold Coast Solar Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 6 of Gold Coast Solar Inc’s 6 installs name a module maker in the “Generator Manufacturer” fields, and most of those (5, 83.3%) used modules recorded as Qcells.

In the last 24 months, 6 of Gold Coast Solar Inc’s 6 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (4, 66.7%) used inverters recorded as Enphase.

In the last 24 months, none of Gold Coast Solar Inc’s 6 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

7 of 8 battery-paired PG&E and SCE installs (87.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells579
Canadian Solar16
Inverter makerEnphase4139
SunPower111
Tesla15
Battery makerLG05
Enphase01
SolarEdge01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 334 of 345 installs, inverters on 345. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Gold Coast Solar Inc as developer on 2 battery storage projects and as installer on 2 (2 name it as both), 2 projects in all with 25 kWh of storage. 2 have the status Paid, with $4,525 in current incentive allocations. Applications were received from Aug 29, 2019 to Oct 10, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid225$4,525

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage225$4,5252$4,525

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1021508Not found in the CSLB License Master file pulled Nov 4, 2026344

License numbers are the ones the utilities recorded on the interconnection applications (345 of 345 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list Gold Coast Solar Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019202020212023Total
unincorporated San Diego County10215088727226

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego94
Riverside73
Los Angeles64
Orange57
San Bernardino46
Ventura9
Kern2

Top cities

CityInstalls
San Diego30
Canyon Lake13
Redlands13
San Marcos11
Temecula11
Hemet9
Escondido8
Murrieta8
Corona6
Fontana6
Long Beach6
Oceanside6
Yorba Linda6
Fountain Valley5
Irvine5

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GOLD COAST SOLAR LLC159
Gold Coast Solar Inc108
GOLD COAST SOLAR74
Gold Coast Solar4

Common questions

Where does Gold Coast Solar Inc install solar?

Its installs are spread across 7 counties. The most are in San Diego County (94 installs), followed by Riverside County (73).

How often does Gold Coast Solar Inc install batteries with solar?

3.4% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 3). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Gold Coast Solar Inc installs are under NEM 3.0 (the Net Billing Tariff)?

2 of its 345 interconnected installs (0.6% of the 345 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.