How many solar installs has Green Energy Stars done in California, and which license number is on its installs?
Green Energy Stars has 64 residential solar installs interconnected in California, active in the records from 2015 through 2021 (Sep 10, 2015 to Mar 16, 2021), most of them in Fresno County (37), Merced County (5) and San Joaquin County (5). The license number recorded on most of its installs, 1015998, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 64
- Last 24 months
- 0
- Total capacity
- 590.2 kW DC
- Median system size
- 7.8 kW DC
- With battery storage
- 0.0% all time; no installs in the last 24 months last 24 months
- Third-party owned
- 1.6% of 64 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- lease 1
- First install
- Sep 10, 2015
- Latest install
- Mar 16, 2021
- Counties
- 13
- Utilities
- PGE 62, SCE 2
- CSLB license
- 1015998, 996467
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2015 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2015 | 5 | 0 |
| 2016 | 6 | 0 |
| 2017 | 19 | 0 |
| 2018 | 23 | 0 |
| 2019 | 10 | 0 |
| 2020 | 0 | 0 |
| 2021 | 1 | 0 |
| 2022 | 0 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 64 interconnected installs with a tariff recorded (64) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 11 | 17.2% | not counted |
| NEM 2.0 | 53 | 82.8% | 0 (0.0%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 1 of Green Energy Stars’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Green Energy Stars exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| Solar Sales Solution | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 64 of Green Energy Stars’ 64 installs name a module maker in the “Generator Manufacturer” fields, and most of those (34, 53.1%) used modules recorded as Canadian Solar.
Across all years, 64 of Green Energy Stars’ 64 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (38, 59.4%) used inverters recorded as SolarEdge.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Canadian Solar | 0 | 34 |
| Qcells | 0 | 7 | |
| Renesola America | 0 | 5 | |
| Silfab | 0 | 4 | |
| CSUN Eurasia Energy Systems Industry and Trade | 0 | 3 | |
| Inverter maker | SolarEdge | 0 | 38 |
| Fronius | 0 | 12 | |
| Enphase | 0 | 11 | |
| SMA | 0 | 3 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 64 of 64 installs, inverters on 64. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1015998 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 41 | ||||
| 996467 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 23 | ||||
License numbers are the ones the utilities recorded on the interconnection applications (64 of 64 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
Counties
| County | Installs |
|---|---|
| Fresno | 37 |
| Merced | 5 |
| San Joaquin | 5 |
| Contra Costa | 4 |
| Kings | 2 |
| Madera | 2 |
| Mariposa | 2 |
| Tulare | 2 |
| Alameda | 1 |
| San Benito | 1 |
| Santa Clara | 1 |
| Solano | 1 |
| Stanislaus | 1 |
Top cities
| City | Installs |
|---|---|
| Fresno | 20 |
| Clovis | 10 |
| Merced | 4 |
| Sanger | 4 |
| Kingsburg | 3 |
| Brentwood | 2 |
| Coulterville | 2 |
| Manteca | 2 |
| Byron | 1 |
| Chowchilla | 1 |
| Concord | 1 |
| Dinuba | 1 |
| Hanford | 1 |
| Lathrop | 1 |
| Los Banos | 1 |
Names as recorded by the utilities
The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Green Energy Stars | 38 |
| GREEN ENERGY STARS | 25 |
| green energy stars | 1 |
Common questions
Where does Green Energy Stars install solar?
Its installs are spread across 13 counties. The most are in Fresno County (37 installs), followed by Merced County (5).
How often does Green Energy Stars install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years.
How many Green Energy Stars installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 64 interconnected installs with a tariff recorded (64) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056