Johnson Electric and Supply

How many solar installs has Johnson Electric and Supply done in California, and which license number is on its installs?

Johnson Electric and Supply has 131 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Apr 22, 2015 to Jul 9, 2026), most of them in San Diego County (123), Riverside County (7) and Tulare County (1). CSLB lists license 958114 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jul 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
131
Last 24 months
34
Total capacity
860.8 kW DC
Median system size
5.9 kW DC
With battery storage
87.5% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
11.6% of 129 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
36 installs, latest Jul 9, 2026
Ownership types recorded
PPA 15
Median battery size
13.5 kWh (7 installs list a capacity)
First install
Apr 22, 2015
Latest install
Jul 9, 2026
Counties
3
Utilities
SDGE 123, SCE 8
CSLB license
958114

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201590
2016160
201700
201820
201960
202050
2021120
2022100
2023310
2024110
2025214
2026 (through Aug 31, 2026)83

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

36 of its 131 interconnected installs (27.7% of the 130 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Jul 9, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02216.9%not counted
NEM 2.07255.4%0 (0.0%)
Net Billing Tariff3627.7%7 (100.0%)
Not recorded1

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 15 of Johnson Electric and Supply’s installs the utility recorded a third-party ownership type: PPA 15, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Johnson Electric and Supply exactly.

Third-party owner named on its installsInstalls
Johnson Electric Sol6
Johnson Electric and5
Sunrun Inc2
Palmeto Solar LLC1
Palmetto Solar LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 30 of Johnson Electric and Supply’s 34 installs name a module maker in the “Generator Manufacturer” fields, and most of those (22, 73.3%) used modules recorded as Qcells.

In the last 24 months, 33 of Johnson Electric and Supply’s 34 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (26, 78.8%) used inverters recorded as Tesla.

In the last 24 months, 7 of Johnson Electric and Supply’s 34 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (7, 100.0%) used batteries recorded as Tesla.

7 of 7 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells2272
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.33
Hyundai1not in top list
JA Solar1not in top list
LG136
Inverter makerTesla2627
Enphase1084
ABB11
SolarEdge112
Battery makerTesla77

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 125 of 131 installs, inverters on 130. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
958114Sole owner license (name not shown)CLEARC-10 Electrical ContractorFeb 24, 2011Jul 31, 2027112

License numbers are the ones the utilities recorded on the interconnection applications (112 of 131 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 958114. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Johnson Electric and Supply’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2020202120222023202420252026Total
unincorporated San Diego County958114433211115

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego123
Riverside7
Tulare1

Top cities

CityInstalls
San Diego70
Chula Vista9
La Mesa7
Escondido6
Bonita4
Carlsbad4
Spring Valley4
Lake Elsinore3
Oceanside3
Santee3
Poway2
Del Mar1
El Cajon1
Encinitas1
Fallbrook1

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
johnson electric and supply90
Johnson Electric and Supply33
JOHNSON ELECTRIC AND SUPPLY DBA JOHNSON ELECTRIC SOLAR7
JOHNSON ELECTRIC AND SUPPLY1

Common questions

Where does Johnson Electric and Supply install solar?

Its installs are spread across 3 counties. The most are in San Diego County (123 installs), followed by Riverside County (7).

How often does Johnson Electric and Supply install batteries with solar?

87.5% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (7 of 7). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Johnson Electric and Supply installs are under NEM 3.0 (the Net Billing Tariff)?

36 of its 131 interconnected installs (27.7% of the 130 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.