MEGA SOLAR INC

How many solar installs has MEGA SOLAR INC done in California, and which license number is on its installs?

MEGA SOLAR INC has 346 residential solar installs interconnected in California, active in the records from 2014 through 2026 (May 28, 2014 to Apr 8, 2026), most of them in Los Angeles County (157), Riverside County (58) and Orange County (49). CSLB lists license 984972 (MEGA SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jul 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
346
Last 24 months
11
Total capacity
3,230.8 kW DC
Median system size
8.8 kW DC
With battery storage
25.1% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 72.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
3.8% of 340 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
7 installs, latest Apr 4, 2026
Ownership types recorded
PPA 12, lease 1
Median battery size
9.8 kWh (85 installs list a capacity)
First install
May 28, 2014
Latest install
Apr 8, 2026
Counties
12
Utilities
SCE 333, SDGE 8, PGE 5
CSLB license
984972

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201440
201520
201600
2017160
2018493
2019252
2020213
2021102
20226613
202312045
2024249
202554
2026 (through Aug 31, 2026)44

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

7 of its 346 interconnected installs (2.0% of the 346 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Apr 4, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.072.0%not counted
NEM 2.033296.0%78 (24.1%)
Net Billing Tariff72.0%7 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 13 of MEGA SOLAR INC’s installs the utility recorded a third-party ownership type: PPA 12, lease 1, prepaid lease 0, other 0. Across all installers, 10 residential systems list a third-party owner name that matches MEGA SOLAR INC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Mega Solar10
Spruce Finance1
Spruce Financial1
Sunrun1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 11 of MEGA SOLAR INC’s 11 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (4, 36.4%) used modules recorded as REC.

In the last 24 months, 11 of MEGA SOLAR INC’s 11 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (5, 45.5%) used inverters recorded as SolarEdge.

In the last 24 months, 8 of MEGA SOLAR INC’s 11 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (5, 62.5%) used batteries recorded as Tesla.

81 of 85 battery-paired PG&E and SCE installs (95.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC4108
Silfab3not in top list
Qcells252
Canadian Solar146
Hanwa Qcell138
Inverter makerSolarEdge5202
Tesla414
Enphase287
Battery makerTesla55
LG272
Enphase11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 324 of 346 installs, inverters on 346. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names MEGA SOLAR INC as developer on 8 battery storage projects and as installer on 8 (8 name it as both), 8 projects in all with 106 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from May 31, 2018 to Apr 14, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Reserved113$12,968
Cancelled792$20,319

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage654$13,0590$0
Equity Resiliency113$12,9680$0
Large-Scale Storage138$7,2600$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
984972MEGA SOLAR INC (Corporation)CLEAR, BOND Pay PendingC-10 Electrical ContractorJul 2, 2013Jul 31, 2027340

License numbers are the ones the utilities recorded on the interconnection applications (340 of 346 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 984972. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles157
Riverside58
Orange49
San Bernardino35
Ventura30
Kern5
Santa Barbara4
Santa Clara3
San Diego2
Calaveras1
Merced1
Tulare1

Top cities

CityInstalls
Corona26
Thousand Oaks10
Placentia9
Yorba Linda9
Altadena8
West Covina8
Fontana6
Irvine6
Long Beach6
Arcadia5
Chino Hills5
Lancaster5
Moorpark5
Rancho Palos Verdes5
Santa Clarita5

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
MEGA SOLAR INC329
Mega Solar Inc9
MEGA SOLAR INC.5
Mega Solar2
Mega Solar Inc.1

Common questions

Where does MEGA SOLAR INC install solar?

Its installs are spread across 12 counties. The most are in Los Angeles County (157 installs), followed by Riverside County (58).

How often does MEGA SOLAR INC install batteries with solar?

25.1% of its interconnected solar installs include battery storage across all years, and 72.7% in the last 24 months (8 of 11). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many MEGA SOLAR INC installs are under NEM 3.0 (the Net Billing Tariff)?

7 of its 346 interconnected installs (2.0% of the 346 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.