ONE NATION ENERGY INC

How many solar installs has ONE NATION ENERGY INC done in California, and which license number is on its installs?

ONE NATION ENERGY INC has 67 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Aug 12, 2024 to Aug 7, 2026), most of them in Fresno County (21), Tulare County (21) and Los Angeles County (13). CSLB lists license 746319 (ONE NATION ENERGY INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Aug 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
67
Last 24 months
66
Total capacity
506.2 kW DC
Median system size
7.2 kW DC
With battery storage
95.5% all time; 97.0% last 24 months
Third-party owned
0.0% of 67 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
64 installs, latest Aug 7, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (40 installs list a capacity)
First install
Aug 12, 2024
Latest install
Aug 7, 2026
Counties
10
Utilities
SCE 36, PGE 31
CSLB license
746319

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
20241210
20254645
2026 (through Aug 31, 2026)99

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

64 of its 67 interconnected installs (95.5% of the 67 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 95.3% of those include battery storage. The latest Net Billing Tariff install was approved Aug 7, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.034.5%3 (100.0%)
Net Billing Tariff6495.5%61 (95.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on ONE NATION ENERGY INC’s installs. No residential system in the file lists a third-party owner name that matches ONE NATION ENERGY INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 66 of ONE NATION ENERGY INC’s 66 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (20, 30.3%) used modules recorded as Qcells.

In the last 24 months, 66 of ONE NATION ENERGY INC’s 66 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (39, 59.1%) used inverters recorded as Enphase.

In the last 24 months, 62 of ONE NATION ENERGY INC’s 66 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (30, 48.4%) used batteries recorded as Enphase.

62 of 64 battery-paired PG&E and SCE installs (96.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells2020
JA Solar1717
LONGi1414
Mission Solar77
Hyundai55
Inverter makerEnphase3940
Tesla2424
sonnen44
Power Center33
ABB11
Battery makerEnphase3030
Tesla2424
sonnen88

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 67 of 67 installs, inverters on 67. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names ONE NATION ENERGY INC as developer on 13 battery storage projects and as installer on 13 (13 name it as both), 13 projects in all with 179 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Mar 12, 2025 to Dec 30, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Reserved10138$114,079
Pending Reservation114$12,155
Waitlist113$14,000
Cancelled114$14,277

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Storage Equity11152$126,2340$0
Equity Resiliency114$14,2770$0
Residential Solar and Storage Equity - AB 209 Non-POU113$14,0000$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
746319ONE NATION ENERGY INC (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorFeb 25, 1998Aug 31, 202767

License numbers are the ones the utilities recorded on the interconnection applications (67 of 67 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 746319. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Fresno21
Tulare21
Los Angeles13
Kern4
Kings2
Riverside2
Madera1
Orange1
San Bernardino1
San Joaquin1

Top cities

CityInstalls
Fresno19
Visalia13
Palmdale7
Bakersfield3
Lancaster3
Dinuba2
Lindsay2
Orosi2
Tulare2
Ahwahnee1
Corona1
Delano1
Hanford1
Huron1
Inglewood1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ONE NATION ENERGY INC67

Common questions

Where does ONE NATION ENERGY INC install solar?

Its installs are spread across 10 counties. The most are in Fresno County (21 installs), followed by Tulare County (21).

How often does ONE NATION ENERGY INC install batteries with solar?

95.5% of its interconnected solar installs include battery storage across all years, and 97.0% in the last 24 months (64 of 66).

How many ONE NATION ENERGY INC installs are under NEM 3.0 (the Net Billing Tariff)?

64 of its 67 interconnected installs (95.5% of the 67 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 95.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.