How many solar installs has PREMIER SOLAR SOLUTION LLC done in California, and which license number is on its installs?

PREMIER SOLAR SOLUTION LLC has 86 residential solar installs interconnected in California, active in the records from 2018 through 2022 (May 14, 2018 to Mar 11, 2022), most of them in Orange County (30), Riverside County (23) and Los Angeles County (19). The license number recorded on most of its installs, 992112, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
86
Last 24 months
0
Total capacity
647.1 kW DC
Median system size
7.1 kW DC
With battery storage
15.1% all time; no installs in the last 24 months last 24 months
Third-party owned
2.3% of 86 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 2
Median battery size
9.8 kWh (13 installs list a capacity)
First install
May 14, 2018
Latest install
Mar 11, 2022
Counties
4
Utilities
SCE 86
CSLB license
992112

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
201810
2019280
2020245
2021327
202211
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 86 interconnected installs with a tariff recorded (86) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.086100.0%13 (15.1%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 2 of PREMIER SOLAR SOLUTION LLC’s installs the utility recorded a third-party ownership type: PPA 0, lease 2, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches PREMIER SOLAR SOLUTION LLC exactly.

Third-party owner named on its installsInstalls
Sunrun2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 86 of PREMIER SOLAR SOLUTION LLC’s 86 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (34, 39.5%) used modules recorded as Silfab.

Across all years, 86 of PREMIER SOLAR SOLUTION LLC’s 86 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (40, 46.5%) used inverters recorded as SolarEdge.

Across all years, 13 of PREMIER SOLAR SOLUTION LLC’s 86 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (10, 76.9%) used batteries recorded as LG.

13 of 13 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab034
CertainTeed025
REC022
Qcells03
LG01
Inverter makerSolarEdge040
Enphase029
SunPower015
SMA02
Battery makerLG010
Tesla02
Enphase01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 86 of 86 installs, inverters on 86. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names PREMIER SOLAR SOLUTION LLC as developer on 5 battery storage projects and as installer on 2 (2 name it as both), 5 projects in all with 46 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Aug 13, 2019 to Jan 31, 2022.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled546$9,940

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage546$9,9400$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
992112Not found in the CSLB License Master file pulled Nov 4, 202686

License numbers are the ones the utilities recorded on the interconnection applications (86 of 86 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list PREMIER SOLAR SOLUTION LLC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20192020Total
unincorporated San Diego County992112224

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Orange30
Riverside23
Los Angeles19
San Bernardino14

Top cities

CityInstalls
Corona12
Fullerton6
Huntington Beach5
Alta Loma3
Fontana3
Fountain Valley3
Irvine3
Lancaster3
Anaheim2
Castaic2
Chino2
Cypress2
Lakewood2
Menifee2
Murrieta2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PREMIER SOLAR SOLUTION LLC86

Common questions

Where does PREMIER SOLAR SOLUTION LLC install solar?

Its installs are spread across 4 counties. The most are in Orange County (30 installs), followed by Riverside County (23).

How often does PREMIER SOLAR SOLUTION LLC install batteries with solar?

15.1% of its interconnected solar installs include battery storage across all years.

How many PREMIER SOLAR SOLUTION LLC installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 86 interconnected installs with a tariff recorded (86) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.