ProjectSolar

How many solar installs has ProjectSolar done in California, and which license number is on its installs?

ProjectSolar has 93 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Nov 18, 2021 to Apr 17, 2026), most of them in San Diego County (80) and Orange County (13). CSLB lists license 1001143 (SILVERLINE SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Feb 28, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to ProjectSolar here carry more than one CSLB license number: 1001143 on 29 (CSLB holder SILVERLINE SOLAR, Canoga Park), 1021997 on 22 (CSLB holder Sole owner license (name not shown)), 1099181 on 19 (CSLB holder PROJECT SOLAR INC, Orem) and 1096811 on 10 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
93
Last 24 months
2
Total capacity
678.2 kW DC
Median system size
6.7 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.0% of 93 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Dec 29, 2023
Ownership types recorded
none recorded
First install
Nov 18, 2021
Latest install
Apr 17, 2026
Counties
2
Utilities
SDGE 93
CSLB license
1001143, 1021997, 1099181, 1096811

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
202130
2022300
2023500
202480
202510
2026 (through Aug 31, 2026)10

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 93 interconnected installs (1.1% of the 93 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Dec 29, 2023.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.09298.9%not recorded
Net Billing Tariff11.1%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on ProjectSolar’s installs. No residential system in the file lists a third-party owner name that matches ProjectSolar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 2 of ProjectSolar’s 2 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used modules recorded as Canadian Solar.

In the last 24 months, 2 of ProjectSolar’s 2 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar256
Inverter makerEnphase293

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 86 of 93 installs, inverters on 93. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1001143SILVERLINE SOLAR (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorFeb 13, 2015Feb 28, 202729
1021997Sole owner license (name not shown)CLEARB General Building Contractor; C-10 Electrical ContractorDec 22, 2016Dec 31, 202622
1099181PROJECT SOLAR INC (Corporation)CLEARC-10 Electrical ContractorNov 30, 2022Nov 30, 202619
1096811Not found in the CSLB License Master file pulled Nov 4, 202610

License numbers are the ones the utilities recorded on the interconnection applications (93 of 93 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for licenses 1001143, 1021997, 1099181. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list ProjectSolar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
City and County of San Francisco100114302011133112
unincorporated San Diego County100114311309200016
unincorporated Marin County10011430100000001

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego80
Orange13

Top cities

CityInstalls
San Diego31
Oceanside6
Carlsbad4
Laguna Niguel4
Alpine3
El Cajon3
Escondido3
Fallbrook3
Poway3
Ramona3
San Clemente3
San Marcos3
Vista3
Chula Vista2
Ladera Ranch2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ProjectSolar93

Common questions

Where does ProjectSolar install solar?

Its installs are spread across 2 counties. The most are in San Diego County (80 installs), followed by Orange County (13).

How often does ProjectSolar install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many ProjectSolar installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 93 interconnected installs (1.1% of the 93 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.