PROJECT SOLAR INC

How many solar installs has PROJECT SOLAR INC done in California, and which license number is on its installs?

PROJECT SOLAR INC has 135 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Jan 3, 2022 to Jun 10, 2026), most of them in Los Angeles County (18), Orange County (18) and Santa Clara County (16). CSLB lists license 1099181 (PROJECT SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Nov 30, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
135
Last 24 months
18
Total capacity
1,066.1 kW DC
Median system size
7.4 kW DC
With battery storage
12.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 44.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 135 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
14 installs, latest Apr 6, 2026
Ownership types recorded
none recorded
Median battery size
12 kWh (6 installs list a capacity)
First install
Jan 3, 2022
Latest install
Jun 10, 2026
Counties
24
Utilities
SCE 71, PGE 60, SDGE 4
CSLB license
1099181

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
202240
2023783
2024437
202543
2026 (through Aug 31, 2026)63

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

14 of its 135 interconnected installs (10.4% of the 135 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The latest Net Billing Tariff install was approved Apr 6, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010.7%not counted
NEM 2.012088.9%9 (7.8%)
Net Billing Tariff1410.4%7 (50.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on PROJECT SOLAR INC’s installs. Across all installers, 9 residential systems list a third-party owner name that matches PROJECT SOLAR INC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 16 of PROJECT SOLAR INC’s 18 installs name a module maker in the “Generator Manufacturer” fields, and most of those (10, 62.5%) used modules recorded as Qcells.

In the last 24 months, 18 of PROJECT SOLAR INC’s 18 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (14, 77.8%) used inverters recorded as Enphase.

In the last 24 months, 8 of PROJECT SOLAR INC’s 18 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (5, 62.5%) used batteries recorded as Enphase.

16 of 16 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1055
Canadian Solar672
SunPower13
Inverter makerEnphase1499
Tesla411
Fronius1not in top list
Battery makerEnphase513
Tesla33

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 129 of 135 installs, inverters on 135. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names PROJECT SOLAR INC as developer on 4 battery storage projects and as installer on 0 (0 name it as both), 4 projects in all with 78 kWh of storage. 2 have the status Paid, with $5,214 in current incentive allocations. Applications were received from May 1, 2023 to Aug 16, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid239$5,214
Cancelled239$5,824

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage478$11,0372$5,214

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1099181PROJECT SOLAR INC (Corporation)CLEARC-10 Electrical ContractorNov 30, 2022Nov 30, 2026131

License numbers are the ones the utilities recorded on the interconnection applications (135 of 135 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1099181. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list PROJECT SOLAR INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2023Total
City and County of San Francisco109918133
unincorporated San Diego County109918166

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles18
Orange18
Santa Clara16
Alameda12
Riverside11
San Bernardino10
San Mateo9
Ventura7
San Diego4
San Francisco4
Contra Costa3
Kern3
Sonoma3
Tulare3
Lake2
Placer2
Santa Barbara2
Solano2
Fresno1
Inyo1
Marin1
San Joaquin1
San Luis Obispo1
Santa Cruz1

Top cities

CityInstalls
San Jose9
Fremont6
San Francisco4
Tustin4
La Habra3
Murrieta3
San Bernardino3
West Covina3
Beaumont2
Burlingame2
Camarillo2
Campbell2
Cupertino2
Downey2
Garden Grove2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PROJECT SOLAR INC129
Project Solar6

Common questions

Where does PROJECT SOLAR INC install solar?

Its installs are spread across 24 counties. The most are in Los Angeles County (18 installs), followed by Orange County (18).

How often does PROJECT SOLAR INC install batteries with solar?

12.2% of its interconnected solar installs include battery storage across all years, and 44.4% in the last 24 months (8 of 18). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many PROJECT SOLAR INC installs are under NEM 3.0 (the Net Billing Tariff)?

14 of its 135 interconnected installs (10.4% of the 135 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.