Silverline Solar

How many solar installs has Silverline Solar done in California, and which license number is on its installs?

Silverline Solar has 132 residential solar installs interconnected in California, active in the records from 2016 through 2026 (Jan 14, 2016 to Aug 27, 2026), most of them in Santa Clara County (27), Alameda County (25) and Los Angeles County (18). CSLB lists license 1001143 (SILVERLINE SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Feb 28, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
132
Last 24 months
94
Total capacity
1,029.4 kW DC
Median system size
6.8 kW DC
With battery storage
61.4% all time; 76.6% last 24 months
Third-party owned
0.0% of 132 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
95 installs, latest Aug 27, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (45 installs list a capacity)
First install
Jan 14, 2016
Latest install
Aug 27, 2026
Counties
18
Utilities
PGE 87, SCE 45
CSLB license
1001143

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201640
2017170
201800
201910
202000
202100
202210
202300
20242919
20255747
2026 (through Aug 31, 2026)2315

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

95 of its 132 interconnected installs (72.0% of the 132 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 78.9% of those include battery storage. The latest Net Billing Tariff install was approved Aug 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0107.6%not counted
NEM 2.02720.5%5 (18.5%)
Net Billing Tariff9572.0%75 (78.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Silverline Solar’s installs. No residential system in the file lists a third-party owner name that matches Silverline Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 91 of Silverline Solar’s 94 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (41, 45.1%) used modules recorded as Hyundai.

In the last 24 months, 94 of Silverline Solar’s 94 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (69, 73.4%) used inverters recorded as Enphase.

In the last 24 months, 66 of Silverline Solar’s 94 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (26, 39.4%) used batteries recorded as Tesla.

75 of 81 battery-paired PG&E and SCE installs (92.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai4141
Qcells3550
REC910
Canadian Solar34
LONGi2not in top list
Inverter makerEnphase6985
Tesla2424
FranklinWH1113
SolarEdge527
Delta Electronics11
Battery makerTesla2626
Enphase2428
FranklinWH1417
SolarEdge24

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 129 of 132 installs, inverters on 132. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1001143SILVERLINE SOLAR (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorFeb 13, 2015Feb 28, 2027131

License numbers are the ones the utilities recorded on the interconnection applications (131 of 132 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1001143. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Silverline Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
City and County of San Francisco100114302011133112
unincorporated San Diego County100114311309200016
unincorporated Marin County10011430100000001

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Santa Clara27
Alameda25
Los Angeles18
Contra Costa17
Ventura15
Orange10
San Mateo7
San Francisco2
Yolo2
Amador1
El Dorado1
Marin1
Riverside1
San Bernardino1
San Joaquin1
Santa Cruz1
Solano1
Sonoma1

Top cities

CityInstalls
San Jose16
Berkeley7
Oakland6
Calabasas5
Camarillo5
Richmond5
Saratoga5
El Cerrito4
Simi Valley4
Fremont3
Garden Grove3
Newbury Park3
Agoura Hills2
Alamo2
Cerritos2

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SILVERLINE SOLAR96
Silverline Solar35
silverline solar1

Common questions

Where does Silverline Solar install solar?

Its installs are spread across 18 counties. The most are in Santa Clara County (27 installs), followed by Alameda County (25).

How often does Silverline Solar install batteries with solar?

61.4% of its interconnected solar installs include battery storage across all years, and 76.6% in the last 24 months (72 of 94).

How many Silverline Solar installs are under NEM 3.0 (the Net Billing Tariff)?

95 of its 132 interconnected installs (72.0% of the 132 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 78.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.