SILVERLINE HOME REMODELING INC

How many solar installs has SILVERLINE HOME REMODELING INC done in California, and which license number is on its installs?

SILVERLINE HOME REMODELING INC has 766 residential solar installs interconnected in California, active in the records from 2016 through 2026 (Apr 7, 2016 to Mar 30, 2026), most of them in Los Angeles County (134), Santa Clara County (103) and Alameda County (95). CSLB lists license 1001143 (SILVERLINE SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Feb 28, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
766
Last 24 months
13
Total capacity
5,442.1 kW DC
Median system size
6.3 kW DC
With battery storage
7.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 7.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.1% of 766 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
4 installs, latest Apr 22, 2025
Ownership types recorded
PPA 1
Median battery size
10.1 kWh (30 installs list a capacity)
First install
Apr 7, 2016
Latest install
Mar 30, 2026
Counties
34
Utilities
PGE 412, SCE 353, SDGE 1
CSLB license
1001143

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201650
201780
2018140
2019420
2020321
2021582
20222108
202332933
20245911
202581
2026 (through Aug 31, 2026)10

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

4 of its 766 interconnected installs (0.5% of the 766 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 25.0% of those include battery storage. The latest Net Billing Tariff install was approved Apr 22, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0121.6%not counted
NEM 2.075097.9%54 (7.2%)
Net Billing Tariff40.5%1 (25.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 1 of SILVERLINE HOME REMODELING INC’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches SILVERLINE HOME REMODELING INC exactly.

Third-party owner named on its installsInstalls
Chabad1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 13 of SILVERLINE HOME REMODELING INC’s 13 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (5, 38.5%) used modules recorded as Qcells.

In the last 24 months, 13 of SILVERLINE HOME REMODELING INC’s 13 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (12, 92.3%) used inverters recorded as Enphase.

In the last 24 months, 1 of SILVERLINE HOME REMODELING INC’s 13 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Enphase.

54 of 56 battery-paired PG&E and SCE installs (96.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells5237
Canadian Solar3297
Hyundai3not in top list
Mission Solar140
Panasonic1not in top list
Inverter makerEnphase12571
SolarEdge2140
Battery makerEnphase150

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 734 of 766 installs, inverters on 766. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SILVERLINE HOME REMODELING INC as developer on 14 battery storage projects and as installer on 14 (14 name it as both), 14 projects in all with 391 kWh of storage. 9 have the status Paid, with $205,707 in current incentive allocations. Applications were received from Jan 29, 2022 to Dec 27, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid9244$205,707
Waitlist126$24,150
Cancelled4120$98,240

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency10292$292,1307$198,530
Small Residential Storage372$11,8172$7,177
Residential Solar and Storage Equity - AB 209126$24,1500$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1001143SILVERLINE SOLAR (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorFeb 13, 2015Feb 28, 2027763

License numbers are the ones the utilities recorded on the interconnection applications (766 of 766 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1001143. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SILVERLINE HOME REMODELING INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
City and County of San Francisco100114302011133112
unincorporated San Diego County100114311309200016
unincorporated Marin County10011430100000001

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles134
Santa Clara103
Alameda95
Orange72
Contra Costa60
Riverside49
San Mateo39
Ventura38
San Bernardino36
Kern21
Santa Barbara13
Sonoma13
Marin12
Solano12
Monterey10
Placer9
San Francisco9
San Joaquin9
San Luis Obispo7
Fresno4
Calaveras3
Yolo3
Butte2
Lake2
Santa Cruz2
Colusa1
El Dorado1
Humboldt1
Inyo1
Mariposa1
Mendocino1
Nevada1
Tulare1
Yuba1

Top cities

CityInstalls
San Jose53
Oakland23
Fremont19
Long Beach17
Sunnyvale14
Simi Valley11
Berkeley10
Richmond10
Saratoga10
Whittier10
Castro Valley9
Hayward9
San Francisco9
Walnut Creek9
San Leandro8

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SILVERLINE HOME REMODELING INC749
Silverline Home Remodeling9
Silverline Home Remodeling Inc6
Silverline home remodeling inc1
Silverline home Remodeling Inc.1

Common questions

Where does SILVERLINE HOME REMODELING INC install solar?

Its installs are spread across 34 counties. The most are in Los Angeles County (134 installs), followed by Santa Clara County (103).

How often does SILVERLINE HOME REMODELING INC install batteries with solar?

7.3% of its interconnected solar installs include battery storage across all years, and 7.7% in the last 24 months (1 of 13). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many SILVERLINE HOME REMODELING INC installs are under NEM 3.0 (the Net Billing Tariff)?

4 of its 766 interconnected installs (0.5% of the 766 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 25.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.