Ra Solar has 826 residential solar installs interconnected in California, active in the records from 2016 through 2026 (Oct 20, 2016 to Apr 21, 2026), most of them in Alameda County (242), Santa Clara County (214) and Contra Costa County (187). The license number recorded on most of its installs, 988918, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
826
Last 24 months
29
Total capacity
4,879.5 kW DC
Median system size
5.4 kW DC
With battery storage
1.1% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 6.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 826 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Oct 24, 2023
Ownership types recorded
none recorded
First install
Oct 20, 2016
Latest install
Apr 21, 2026
Counties
18
Utilities
PGE 818, SCE 4, SDGE 4
CSLB license
988918

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201650
2017700
20181650
20192070
20201290
20211033
2022773
2023341
2024120
2025192
2026 (through Aug 31, 2026)50

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 826 interconnected installs (0.1% of the 826 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Oct 24, 2023.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.091.1%not counted
NEM 2.081698.8%8 (1.0%)
Net Billing Tariff10.1%1 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Ra Solar’s installs. No residential system in the file lists a third-party owner name that matches Ra Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 11 of Ra Solar’s 29 installs name a module maker in the “Generator Manufacturer” fields, and most of those (6, 54.5%) used modules recorded as Panasonic.

In the last 24 months, 29 of Ra Solar’s 29 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (16, 55.2%) used inverters recorded as Enphase.

In the last 24 months, 1 of Ra Solar’s 29 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Tesla.

2 of 9 battery-paired PG&E and SCE installs (22.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerPanasonic6421
Hyundai2not in top list
Panansonic1not in top list
Qcells129
REC1not in top list
Inverter makerEnphase16412
SolarEdge11405
Tesla2not in top list
Panansonic16
SMA1not in top list
Battery makerTesla12

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 789 of 826 installs, inverters on 826. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Ra Solar as developer on 0 battery storage projects and as installer on 2 (0 name it as both), 2 projects in all with 32 kWh of storage. 1 have the status Paid, with $16,160 in current incentive allocations. Applications were received from Dec 23, 2020 to Aug 18, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid116$16,160
Cancelled116$2,593

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency116$16,1601$16,160
Small Residential Storage116$2,5930$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
988918Not found in the CSLB License Master file pulled Nov 4, 2026817

License numbers are the ones the utilities recorded on the interconnection applications (817 of 826 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list Ra Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020Total
City and County of San Francisco9889181102
unincorporated Marin County9889180213

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Alameda242
Santa Clara214
Contra Costa187
San Mateo91
Solano30
Placer15
Santa Cruz13
Fresno10
Marin7
San Francisco4
Los Angeles2
Orange2
San Diego2
Sonoma2
Tulare2
Kings1
Napa1
Santa Barbara1

Top cities

CityInstalls
San Jose134
Fremont60
San Ramon56
Oakland42
Pleasanton25
Danville24
Dublin22
Walnut Creek18
Livermore17
Castro Valley16
Hayward16
San Mateo16
Concord15
Belmont13
Berkeley13

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
RA SOLAR463
Ra Solar357
Ra SOLAR3
ra solar2
Ra. Solar1

Common questions

Where does Ra Solar install solar?

Its installs are spread across 18 counties. The most are in Alameda County (242 installs), followed by Santa Clara County (214).

How often does Ra Solar install batteries with solar?

1.1% of its interconnected solar installs include battery storage across all years, and 6.9% in the last 24 months (2 of 29). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Ra Solar installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 826 interconnected installs (0.1% of the 826 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.