SCC Solar Energy Inc.

How many solar installs has SCC Solar Energy Inc. done in California, and which license number is on its installs?

SCC Solar Energy Inc. has 161 residential solar installs interconnected in California, active in the records from 2015 through 2020 (Jul 1, 2015 to Jan 16, 2020), most of them in Riverside County (52), San Bernardino County (45) and Orange County (26). The license number recorded on most of its installs, 1008491, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
161
Last 24 months
0
Total capacity
1,054 kW DC
Median system size
5.9 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 161 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Jul 1, 2015
Latest install
Jan 16, 2020
Counties
8
Utilities
SCE 143, SDGE 12, PGE 6
CSLB license
1008491

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201520
2016590
2017650
2018260
201970
202020
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 161 interconnected installs with a tariff recorded (161) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.09257.1%not counted
NEM 2.06942.9%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SCC Solar Energy Inc.’s installs. No residential system in the file lists a third-party owner name that matches SCC Solar Energy Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 161 of SCC Solar Energy Inc.’s 161 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (51, 31.7%) used modules recorded as SolarWorld.

Across all years, 161 of SCC Solar Energy Inc.’s 161 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (101, 62.7%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarWorld051
Flextronics037
Sun Edison034
Qcells014
Hyundai09
Inverter makerEnphase0101
SolarEdge055
SMA04
Fronius01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 161 of 161 installs, inverters on 161. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SCC Solar Energy Inc. as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 5 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Mar 20, 2015 to Mar 20, 2015.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled15$9,110

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Not stated15$9,1100$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1008491Not found in the CSLB License Master file pulled Nov 4, 2026157

License numbers are the ones the utilities recorded on the interconnection applications (159 of 161 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Riverside52
San Bernardino45
Orange26
Los Angeles23
San Diego9
Fresno4
Kern1
San Mateo1

Top cities

CityInstalls
Fontana10
San Bernardino8
Palm Springs7
Redlands6
Riverside6
Perris5
Carson4
Lake Elsinore4
Murrieta4
Carlsbad3
Corona3
Fullerton3
Moreno Valley3
Placentia3
Rialto3

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SCC Solar Energy Inc.94
SCC SOLAR ENERGY INC48
SCC Solar Energy Inc12
scc solar energy4
SCC SOLAR ENERGY2
Scc Solar Energy Inc.1

Common questions

Where does SCC Solar Energy Inc. install solar?

Its installs are spread across 8 counties. The most are in Riverside County (52 installs), followed by San Bernardino County (45).

How often does SCC Solar Energy Inc. install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many SCC Solar Energy Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 161 interconnected installs with a tariff recorded (161) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.