How many solar installs has Solar Roofing and Energy Storage done in California, and which license number is on its installs?

Solar Roofing and Energy Storage has 47 residential solar installs interconnected in California, active in the records from 2023 through 2026 (Dec 2, 2023 to Aug 19, 2026), most of them in San Diego County (46) and Orange County (1). CSLB lists license 1109997 (SOLAR ROOFING AND ENERGY STORAGE INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-39, C-46, expires Apr 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
47
Last 24 months
41
Total capacity
328 kW DC
Median system size
6.3 kW DC
With battery storage
100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 47 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
47 installs, latest Aug 19, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (1 installs list a capacity)
First install
Dec 2, 2023
Latest install
Aug 19, 2026
Counties
2
Utilities
SDGE 46, SCE 1
CSLB license
1109997

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2023 to 2026

YearInstalls interconnectedWith battery storage
202330
2024110
2025281
2026 (through Aug 31, 2026)50

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

47 of its 47 interconnected installs (100.0% of the 47 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 19, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.000.0%0
Net Billing Tariff47100.0%1 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Solar Roofing and Energy Storage’s installs. No residential system in the file lists a third-party owner name that matches Solar Roofing and Energy Storage exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 41 of Solar Roofing and Energy Storage’s 41 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (11, 26.8%) used modules recorded as JinkoSolar.

In the last 24 months, 41 of Solar Roofing and Energy Storage’s 41 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (26, 63.4%) used inverters recorded as Tesla.

In the last 24 months, 1 of Solar Roofing and Energy Storage’s 41 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Tesla.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJinkoSolar1111
Aptos Solar99
Trina Solar55
Silfab38
Solaria33
Inverter makerTesla2626
FOXESSCO.,LTD77
Enphase610
EG423
Battery makerTesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 47 of 47 installs, inverters on 47. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1109997SOLAR ROOFING AND ENERGY STORAGE INC (Corporation)CLEARB General Building Contractor; C-39 Roofing Contractor; C-46 Solar ContractorSep 12, 2023Apr 30, 202747

License numbers are the ones the utilities recorded on the interconnection applications (47 of 47 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1109997. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Solar Roofing and Energy Storage’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense202420252026Total
unincorporated San Diego County110999729718

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego46
Orange1

Top cities

CityInstalls
San Diego18
La Jolla3
Oceanside3
Vista3
Chula Vista2
El Cajon2
Escondido2
Lakeside2
Poway2
Alpine1
Carlsbad1
Encinitas1
La Mesa1
Laguna Beach1
Rancho la Costa1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Solar Roofing and Energy Storage46
SOLAR ROOFING AND ENERGY STORAGE INC1

Common questions

Where does Solar Roofing and Energy Storage install solar?

Its installs are spread across 2 counties. The most are in San Diego County (46 installs), followed by Orange County (1).

How often does Solar Roofing and Energy Storage install batteries with solar?

100.0% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (1 of 1). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Solar Roofing and Energy Storage installs are under NEM 3.0 (the Net Billing Tariff)?

47 of its 47 interconnected installs (100.0% of the 47 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.