STATE WIDE ELECTRIC INC has 90 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Oct 24, 2018 to Jun 22, 2026), most of them in Fresno County (38), Madera County (14) and San Joaquin County (8). CSLB lists license 1033257 (STATE WIDE ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
90
Last 24 months
14
Total capacity
721.4 kW DC
Median system size
7.2 kW DC
With battery storage
11.1% all time; 57.1% last 24 months
Third-party owned
3.3% of 90 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
11 installs, latest Jun 22, 2026
Ownership types recorded
PPA 3
Median battery size
12.8 kWh (6 installs list a capacity)
First install
Oct 24, 2018
Latest install
Jun 22, 2026
Counties
13
Utilities
PGE 86, SCE 4
CSLB license
1033257

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
201830
201920
202050
202180
2022100
2023440
202462
202541
2026 (through Aug 31, 2026)87

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

11 of its 90 interconnected installs (12.2% of the 90 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.9% of those include battery storage. The latest Net Billing Tariff install was approved Jun 22, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.07987.8%0 (0.0%)
Net Billing Tariff1112.2%10 (90.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 3 of STATE WIDE ELECTRIC INC’s installs the utility recorded a third-party ownership type: PPA 3, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches STATE WIDE ELECTRIC INC exactly.

Third-party owner named on its installsInstalls
Goodleap2
Everbright LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 13 of STATE WIDE ELECTRIC INC’s 14 installs name a module maker in the “Generator Manufacturer” fields, and most of those (7, 53.8%) used modules recorded as Qcells.

In the last 24 months, 14 of STATE WIDE ELECTRIC INC’s 14 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (7, 50.0%) used inverters recorded as Enphase.

In the last 24 months, 5 of STATE WIDE ELECTRIC INC’s 14 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (3, 60.0%) used batteries recorded as Tesla.

7 of 10 battery-paired PG&E and SCE installs (70.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells759
Foxess33
Hyundai221
Hanersun Energy Co., Ltd.1not in top list
JinkoSolar1not in top list
Inverter makerEnphase736
Foxess33
Tesla33
SolarEdge248
Battery makerTesla33
Enphase24

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 89 of 90 installs, inverters on 90. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1033257STATE WIDE ELECTRIC INC (Corporation)CLEARC-10 Electrical ContractorNov 22, 2017Nov 30, 202787

License numbers are the ones the utilities recorded on the interconnection applications (88 of 90 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1033257. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Fresno38
Madera14
San Joaquin8
Santa Clara8
Alameda5
Tulare5
Placer3
Contra Costa2
Kern2
Merced2
Kings1
Monterey1
Nevada1

Top cities

CityInstalls
Sanger13
Fresno11
Madera11
San Jose7
Reedley6
Stockton4
Clovis3
Kingsburg3
Bakersfield2
Hayward2
Lincoln2
Manteca2
Parlier2
Porterville2
Antioch1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
STATE WIDE ELECTRIC INC85
State Wide Electric Inc.4
STATE WIDE ELECTRIC1

Common questions

Where does STATE WIDE ELECTRIC INC install solar?

Its installs are spread across 13 counties. The most are in Fresno County (38 installs), followed by Madera County (14).

How often does STATE WIDE ELECTRIC INC install batteries with solar?

11.1% of its interconnected solar installs include battery storage across all years, and 57.1% in the last 24 months (8 of 14).

How many STATE WIDE ELECTRIC INC installs are under NEM 3.0 (the Net Billing Tariff)?

11 of its 90 interconnected installs (12.2% of the 90 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.