Sun Bees Group Inc
How many solar installs has Sun Bees Group Inc done in California, and which license number is on its installs?
Sun Bees Group Inc has 312 residential solar installs interconnected in California, active in the records from 2012 through 2017 (Sep 24, 2012 to Jul 3, 2017), most of them in Los Angeles County (133), San Bernardino County (67) and Riverside County (52). CSLB lists license 970591 (TRUEPOWER SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires Mar 31, 2028.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 312
- Last 24 months
- 0
- Total capacity
- 2,063.5 kW DC
- Median system size
- 6.1 kW DC
- With battery storage
- 0.0% all time; no installs in the last 24 months last 24 months
- Third-party owned
- 66.1% of 304 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- PPA 7, lease 193, prepaid lease 1
- First install
- Sep 24, 2012
- Latest install
- Jul 3, 2017
- Counties
- 6
- Utilities
- SCE 311, PGE 1
- CSLB license
- 970591
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2012 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2012 | 10 | 0 |
| 2013 | 82 | 0 |
| 2014 | 5 | 0 |
| 2015 | 31 | 0 |
| 2016 | 101 | 0 |
| 2017 | 83 | 0 |
| 2018 | 0 | 0 |
| 2019 | 0 | 0 |
| 2020 | 0 | 0 |
| 2021 | 0 | 0 |
| 2022 | 0 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 312 interconnected installs with a tariff recorded (312) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 312 | 100.0% | not counted |
| NEM 2.0 | 0 | 0.0% | 0 |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 201 of Sun Bees Group Inc’s installs the utility recorded a third-party ownership type: PPA 7, lease 193, prepaid lease 1, other 0. No residential system in the file lists a third-party owner name that matches Sun Bees Group Inc exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| SunPower | 98 |
| SunPower Capital LLC | 42 |
| MySolar 1 LLC | 18 |
| Kilowatt Systems, LLC | 12 |
| Sun Power | 8 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 211 of Sun Bees Group Inc’s 312 installs name a module maker in the “Generator Manufacturer” fields, and most of those (166, 78.7%) used modules recorded as SunPower.
Across all years, 312 of Sun Bees Group Inc’s 312 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (136, 43.6%) used inverters recorded as SMA.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | SunPower | 0 | 166 |
| SolarWorld | 0 | 24 | |
| Canadian Solar | 0 | 10 | |
| Phono Solar Technology | 0 | 4 | |
| Hyundai | 0 | 2 | |
| Inverter maker | SMA | 0 | 136 |
| SunPower | 0 | 76 | |
| Enphase | 0 | 39 | |
| ABB | 0 | 35 | |
| Power-One | 0 | 15 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 211 of 312 installs, inverters on 312. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 970591 | TRUEPOWER SOLAR (Corporation) | CLEAR | B General Building Contractor; C-46 Solar Contractor | Mar 5, 2012 | Mar 31, 2028 | 274 |
License numbers are the ones the utilities recorded on the interconnection applications (274 of 312 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 970591. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Local solar permits naming its license
Solar permits in city and county open data that list Sun Bees Group Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2018 | 2019 | 2020 | 2021 | 2022 | Total |
|---|---|---|---|---|---|---|---|
| unincorporated San Diego County | 970591 | 1 | 3 | 2 | 2 | 3 | 11 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Other names reported under the same license
- SUN BEES GROUPS INC DBA TRUE POWER SOLAR: 1,921 installs, license 970591
- True Power Solar: 157 installs, license 970591
- TRUEPOWER SOLAR: 94 installs, license 970591
Counties
| County | Installs |
|---|---|
| Los Angeles | 133 |
| San Bernardino | 67 |
| Riverside | 52 |
| Orange | 51 |
| Ventura | 8 |
| Alameda | 1 |
Top cities
| City | Installs |
|---|---|
| Arcadia | 19 |
| Irvine | 13 |
| Pomona | 12 |
| Corona | 10 |
| Fontana | 10 |
| Rancho Cucamonga | 10 |
| West Covina | 10 |
| El Monte | 8 |
| Santa Ana | 8 |
| Alta Loma | 7 |
| Chino Hills | 7 |
| Covina | 6 |
| Murrieta | 6 |
| Chino | 5 |
| Hesperia | 5 |
Names as recorded by the utilities
The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Sun Bees Group Inc | 210 |
| SUN BEES GROUP, INC | 101 |
| Sun Bees Group | 1 |
Common questions
Where does Sun Bees Group Inc install solar?
Its installs are spread across 6 counties. The most are in Los Angeles County (133 installs), followed by San Bernardino County (67).
How often does Sun Bees Group Inc install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years.
How many Sun Bees Group Inc installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 312 interconnected installs with a tariff recorded (312) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.