Sungenia Solar Solutions

How many solar installs has Sungenia Solar Solutions done in California, and which license number is on its installs?

Sungenia Solar Solutions has 547 residential solar installs interconnected in California, active in the records from 2014 through 2026 (Nov 14, 2014 to Aug 20, 2026), most of them in San Diego County (523), Orange County (20) and Riverside County (3). CSLB lists license 998985 (SUNGENIA SOLAR CONSTRUCTION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Dec 31, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
547
Last 24 months
76
Total capacity
5,075.2 kW DC
Median system size
7.3 kW DC
With battery storage
20.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.0% of 546 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
65 installs, latest Aug 20, 2026
Ownership types recorded
none recorded
Median battery size
9.8 kWh (1 installs list a capacity)
First install
Nov 14, 2014
Latest install
Aug 20, 2026
Counties
4
Utilities
SDGE 542, SCE 4, PGE 1
CSLB license
998985

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201410
2015120
2016330
2017330
2018391
2019570
2020400
2021450
2022860
2023980
2024410
2025480
2026 (through Aug 31, 2026)140

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

65 of its 547 interconnected installs (11.9% of the 547 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Aug 20, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0325.9%not counted
NEM 2.045082.3%1 (33.3%)
Net Billing Tariff6511.9%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Sungenia Solar Solutions’s installs. No residential system in the file lists a third-party owner name that matches Sungenia Solar Solutions exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 69 of Sungenia Solar Solutions’ 76 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (29, 42.0%) used modules recorded as HDHYUNDAIENERGYSOLUTIONSCO.,LTD..

In the last 24 months, 76 of Sungenia Solar Solutions’ 76 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (52, 68.4%) used inverters recorded as Tesla.

In the last 24 months, none of Sungenia Solar Solutions’ 76 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHDHYUNDAIENERGYSOLUTIONSCO.,LTD.2929
Silfab19209
Qcells996
UnitedRenewableEnergyCo.,Ltd.446
LONGi3not in top list
Inverter makerTesla5255
Enphase21161
SolarEdge3334
EG41not in top list
Sol-Ark1not in top list
Battery makerLG01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 505 of 547 installs, inverters on 547. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
998985SUNGENIA SOLAR CONSTRUCTION (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorDec 4, 2014Dec 31, 2026518

License numbers are the ones the utilities recorded on the interconnection applications (518 of 547 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 998985. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Sungenia Solar Solutions’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County99898512141517293115168157

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego523
Orange20
Riverside3
San Joaquin1

Top cities

CityInstalls
San Diego121
Poway112
Rancho Santa Fe64
Escondido27
Carlsbad24
Vista23
Ramona17
Bonsall15
Coronado13
San Marcos13
Chula Vista12
Del Mar12
Encinitas11
La Jolla11
Fallbrook10

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Sungenia Solar Solutions544
SUNGENIA SOLAR SOLUTIONS3

Common questions

Where does Sungenia Solar Solutions install solar?

Its installs are spread across 4 counties. The most are in San Diego County (523 installs), followed by Orange County (20).

How often does Sungenia Solar Solutions install batteries with solar?

20.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Sungenia Solar Solutions installs are under NEM 3.0 (the Net Billing Tariff)?

65 of its 547 interconnected installs (11.9% of the 547 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.