SUNGUIDE SOLAR INC

How many solar installs has SUNGUIDE SOLAR INC done in California, and which license number is on its installs?

SUNGUIDE SOLAR INC has 45 residential solar installs interconnected in California, active in the records from 2020 through 2025 (Nov 9, 2020 to Nov 11, 2025), most of them in San Bernardino County (27), Los Angeles County (8) and Riverside County (5). The license number recorded on most of its installs, 1067541, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
45
Last 24 months
3
Total capacity
403 kW DC
Median system size
8.2 kW DC
With battery storage
4.5% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 33.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 45 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
5 installs, latest Nov 11, 2025
Ownership types recorded
none recorded
Median battery size
16.4 kWh (2 installs list a capacity)
First install
Nov 9, 2020
Latest install
Nov 11, 2025
Counties
6
Utilities
SCE 44, SDGE 1
CSLB license
1067541

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
202080
202160
202290
2023170
202442
202510
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

5 of its 45 interconnected installs (11.1% of the 45 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 40.0% of those include battery storage. The latest Net Billing Tariff install was approved Nov 11, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.04088.9%0 (0.0%)
Net Billing Tariff511.1%2 (40.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SUNGUIDE SOLAR INC’s installs. No residential system in the file lists a third-party owner name that matches SUNGUIDE SOLAR INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 3 of SUNGUIDE SOLAR INC’s 3 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (1, 33.3%) used modules recorded as Axitec.

In the last 24 months, 3 of SUNGUIDE SOLAR INC’s 3 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 66.7%) used inverters recorded as APsystems (Altenergy Power System).

In the last 24 months, none of SUNGUIDE SOLAR INC’s 3 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

1 of 2 battery-paired PG&E and SCE installs (50.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerAxitec114
JinkoSolar11
Qcells111
Savant Power1not in top list
Inverter makerAPsystems (Altenergy Power System)23
Savant Energy1not in top list
Battery makerGoodwe01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 45 of 45 installs, inverters on 45. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SUNGUIDE SOLAR INC as developer on 1 battery storage project and as installer on 1 (1 name it as both), 1 projects in all with 18 kWh of storage. 1 have the status Paid, with $4,463 in current incentive allocations. Applications were received from Oct 1, 2024 to Oct 1, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid118$4,463

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Large-Scale Storage118$4,4631$4,463

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1067541Not found in the CSLB License Master file pulled Nov 4, 202645

License numbers are the ones the utilities recorded on the interconnection applications (45 of 45 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
San Bernardino27
Los Angeles8
Riverside5
Orange3
San Diego1
Ventura1

Top cities

CityInstalls
Chino Hills8
Chino6
Rancho Cucamonga4
Eastvale2
Ontario2
San Dimas2
Apple Valley1
Beaumont1
Buena Park1
Claremont1
Corona1
Cypress1
Etiwanda1
Fontana1
Fullerton1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUNGUIDE SOLAR INC44
SunGuide Solar Inc1

Common questions

Where does SUNGUIDE SOLAR INC install solar?

Its installs are spread across 6 counties. The most are in San Bernardino County (27 installs), followed by Los Angeles County (8).

How often does SUNGUIDE SOLAR INC install batteries with solar?

4.5% of its interconnected solar installs include battery storage across all years, and 33.3% in the last 24 months (1 of 3). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many SUNGUIDE SOLAR INC installs are under NEM 3.0 (the Net Billing Tariff)?

5 of its 45 interconnected installs (11.1% of the 45 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 40.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.