SUNNERA CONSTRUCTION

How many solar installs has SUNNERA CONSTRUCTION done in California, and which license number is on its installs?

SUNNERA CONSTRUCTION has 132 residential solar installs interconnected in California, active in the records from 2020 through 2024 (Jun 22, 2020 to Jan 8, 2024), most of them in Los Angeles County (41), San Bernardino County (34) and San Diego County (12). CSLB lists license 1049235 (SUNNERA CONSTRUCTION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Jan 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
132
Last 24 months
0
Total capacity
1,123.5 kW DC
Median system size
7.5 kW DC
With battery storage
4.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
2.3% of 132 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 1, other 2
Median battery size
10.1 kWh (5 installs list a capacity)
First install
Jun 22, 2020
Latest install
Jan 8, 2024
Counties
15
Utilities
SCE 99, PGE 20, SDGE 13
CSLB license
1049235

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
2020281
2021511
2022481
202341
202411
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 132 interconnected installs with a tariff recorded (132) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.0132100.0%5 (4.2%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 3 of SUNNERA CONSTRUCTION’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 2. Across all installers, 1 residential systems list a third-party owner name that matches SUNNERA CONSTRUCTION exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sungage2
SUNNERA CONSTRUCTION1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 118 of SUNNERA CONSTRUCTION’s 132 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (44, 37.3%) used modules recorded as LONGi.

Across all years, 132 of SUNNERA CONSTRUCTION’s 132 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (73, 55.3%) used inverters recorded as SolarEdge.

Across all years, 5 of SUNNERA CONSTRUCTION’s 132 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (2, 40.0%) used batteries recorded as Enphase.

5 of 5 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLONGi044
Qcells041
Aptos Solar016
LG07
REC03
Inverter makerSolarEdge073
Enphase048
SunPower06
Delta Electronics04
SMA04
Battery makerEnphase02
LG02
SunPower01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 118 of 132 installs, inverters on 132. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1049235SUNNERA CONSTRUCTION (Corporation)CLEARB General Building ContractorJan 22, 2019Jan 31, 2027128

License numbers are the ones the utilities recorded on the interconnection applications (132 of 132 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1049235. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SUNNERA CONSTRUCTION’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2020Total
unincorporated San Diego County104923511

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Los Angeles41
San Bernardino34
San Diego12
Fresno8
Orange8
Kern7
Riverside7
Tulare6
Ventura3
Alameda1
Amador1
Kings1
Santa Barbara1
Solano1
Sonoma1

Top cities

CityInstalls
Victorville13
Bakersfield6
Fontana5
Fresno5
Lakewood5
West Covina5
Fullerton4
Lancaster4
Pomona4
Rialto4
Murrieta3
Palmdale3
San Bernardino3
Tulare3
Apple Valley2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUNNERA CONSTRUCTION119
Sunnera Construction Inc13

Common questions

Where does SUNNERA CONSTRUCTION install solar?

Its installs are spread across 15 counties. The most are in Los Angeles County (41 installs), followed by San Bernardino County (34).

How often does SUNNERA CONSTRUCTION install batteries with solar?

4.2% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many SUNNERA CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 132 interconnected installs with a tariff recorded (132) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.