SUPERIOR SOLAR ELECTRIC GROUP

How many solar installs has SUPERIOR SOLAR ELECTRIC GROUP done in California, and which license number is on its installs?

SUPERIOR SOLAR ELECTRIC GROUP has 114 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Mar 16, 2021 to Jun 10, 2026), most of them in Santa Clara County (24), Placer County (16) and Contra Costa County (13). CSLB lists license 1030114 (SUPERIOR SOLAR ELECTRIC GROUP) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Dec 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
114
Last 24 months
42
Total capacity
982.4 kW DC
Median system size
7.9 kW DC
With battery storage
41.2% all time; 90.5% last 24 months
Third-party owned
0.0% of 114 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
51 installs, latest Jun 10, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (37 installs list a capacity)
First install
Mar 16, 2021
Latest install
Jun 10, 2026
Counties
19
Utilities
PGE 114
CSLB license
1030114

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
2021181
2022260
2023212
20241815
20252525
2026 (through Aug 31, 2026)64

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

51 of its 114 interconnected installs (44.7% of the 114 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 88.2% of those include battery storage. The latest Net Billing Tariff install was approved Jun 10, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010.9%not counted
NEM 2.06254.4%2 (3.2%)
Net Billing Tariff5144.7%45 (88.2%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SUPERIOR SOLAR ELECTRIC GROUP’s installs. No residential system in the file lists a third-party owner name that matches SUPERIOR SOLAR ELECTRIC GROUP exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 42 of SUPERIOR SOLAR ELECTRIC GROUP’s 42 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (11, 26.2%) used modules recorded as Qcells.

In the last 24 months, 42 of SUPERIOR SOLAR ELECTRIC GROUP’s 42 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (27, 64.3%) used inverters recorded as SolarEdge.

In the last 24 months, 38 of SUPERIOR SOLAR ELECTRIC GROUP’s 42 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (18, 47.4%) used batteries recorded as SolarEdge.

47 of 47 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1137
Hyundai88
REC723
Trina Solar5not in top list
Canadian Solar47
Inverter makerSolarEdge2779
Enphase929
FranklinWH88
Tesla66
Battery makerSolarEdge1820
FranklinWH88
LG613
Tesla66

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 112 of 114 installs, inverters on 114. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1030114SUPERIOR SOLAR ELECTRIC GROUP (Corporation)CLEARC-10 Electrical ContractorAug 17, 2017Dec 31, 2028114

License numbers are the ones the utilities recorded on the interconnection applications (114 of 114 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1030114. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SUPERIOR SOLAR ELECTRIC GROUP’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2022Total
City and County of San Francisco103011411

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Santa Clara24
Placer16
Contra Costa13
Merced7
Nevada7
Stanislaus7
Yuba7
Yolo5
Alameda4
San Mateo4
Solano4
Napa3
San Benito3
San Joaquin3
El Dorado2
San Francisco2
Fresno1
Kings1
Sutter1

Top cities

CityInstalls
San Jose19
Rocklin7
Antioch6
Newman6
Grass Valley5
Los Banos5
West Sacramento5
Pittsburg4
Auburn3
Hollister3
Lincoln3
Olivehurst3
Plumas Lake3
American Canyon2
Loomis2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUPERIOR SOLAR ELECTRIC GROUP114

Common questions

Where does SUPERIOR SOLAR ELECTRIC GROUP install solar?

Its installs are spread across 19 counties. The most are in Santa Clara County (24 installs), followed by Placer County (16).

How often does SUPERIOR SOLAR ELECTRIC GROUP install batteries with solar?

41.2% of its interconnected solar installs include battery storage across all years, and 90.5% in the last 24 months (38 of 42).

How many SUPERIOR SOLAR ELECTRIC GROUP installs are under NEM 3.0 (the Net Billing Tariff)?

51 of its 114 interconnected installs (44.7% of the 114 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 88.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.