THE BIG DEAL SOLAR INC

How many solar installs has THE BIG DEAL SOLAR INC done in California, and which license number is on its installs?

THE BIG DEAL SOLAR INC has 102 residential solar installs interconnected in California, active in the records from 2021 through 2025 (Jul 14, 2021 to Sep 4, 2025), most of them in Riverside County (70), San Bernardino County (18) and Los Angeles County (11). The license number recorded on most of its installs, 1064475, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
102
Last 24 months
9
Total capacity
1,006.4 kW DC
Median system size
9.5 kW DC
With battery storage
19.6% all time; 77.8% last 24 months
Third-party owned
0.0% of 102 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
23 installs, latest Sep 4, 2025
Ownership types recorded
none recorded
Median battery size
13.6 kWh (20 installs list a capacity)
First install
Jul 14, 2021
Latest install
Sep 4, 2025
Counties
4
Utilities
SCE 102
CSLB license
1064475

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
2021100
2022335
2023352
20242312
202511
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

23 of its 102 interconnected installs (22.5% of the 102 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 56.5% of those include battery storage. The latest Net Billing Tariff install was approved Sep 4, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.07977.5%7 (8.9%)
Net Billing Tariff2322.5%13 (56.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on THE BIG DEAL SOLAR INC’s installs. No residential system in the file lists a third-party owner name that matches THE BIG DEAL SOLAR INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 9 of THE BIG DEAL SOLAR INC’s 9 installs name a module maker in the “Generator Manufacturer” fields, and most of those (6, 66.7%) used modules recorded as Qcells.

In the last 24 months, 9 of THE BIG DEAL SOLAR INC’s 9 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (8, 88.9%) used inverters recorded as Enphase.

In the last 24 months, 7 of THE BIG DEAL SOLAR INC’s 9 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (5, 71.4%) used batteries recorded as FranklinWH.

16 of 20 battery-paired PG&E and SCE installs (80.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells684
Canadian Solar22
REC13
SunPower1not in top list
Inverter makerEnphase856
SMA12
Battery makerFranklinWH59
Enphase25

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 96 of 102 installs, inverters on 102. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names THE BIG DEAL SOLAR INC as developer on 7 battery storage projects and as installer on 4 (4 name it as both), 7 projects in all with 159 kWh of storage. 5 have the status Paid, with $98,420 in current incentive allocations. Applications were received from Jul 17, 2020 to Jul 26, 2022.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid5140$98,420
Cancelled219$4,245

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage437$7,8652$3,620
Equity Resiliency3122$94,8003$94,800

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1064475Not found in the CSLB License Master file pulled Nov 4, 2026102

License numbers are the ones the utilities recorded on the interconnection applications (102 of 102 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list THE BIG DEAL SOLAR INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20202021202220232025Total
unincorporated San Diego County1064475213219

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Riverside70
San Bernardino18
Los Angeles11
Orange3

Top cities

CityInstalls
Palm Springs12
Corona11
Desert Hot Springs10
Cathedral City9
Rancho Mirage4
Riverside4
Yucca Valley4
Beaumont3
Hemet3
Palm Desert3
Chino Hills2
Claremont2
Jurupa Valley2
Long Beach2
Orange2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
THE BIG DEAL SOLAR INC102

Common questions

Where does THE BIG DEAL SOLAR INC install solar?

Its installs are spread across 4 counties. The most are in Riverside County (70 installs), followed by San Bernardino County (18).

How often does THE BIG DEAL SOLAR INC install batteries with solar?

19.6% of its interconnected solar installs include battery storage across all years, and 77.8% in the last 24 months (7 of 9).

How many THE BIG DEAL SOLAR INC installs are under NEM 3.0 (the Net Billing Tariff)?

23 of its 102 interconnected installs (22.5% of the 102 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 56.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.