180 Solar Power

How many solar installs has 180 Solar Power done in California, and which license number is on its installs?

180 Solar Power has 308 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Mar 3, 2015 to Apr 26, 2026), most of them in San Diego County (257), Riverside County (33) and Orange County (14). CSLB lists license 995321 (180 ROOFING PROS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-39, C-46, expires Aug 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
308
Last 24 months
13
Total capacity
2,081.2 kW DC
Median system size
6.2 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.0% of 303 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
14 installs, latest Mar 19, 2026
Ownership types recorded
none recorded
First install
Mar 3, 2015
Latest install
Apr 26, 2026
Counties
4
Utilities
SDGE 270, SCE 38
CSLB license
995321

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
2015170
2016340
2017270
2018540
2019560
2020180
2021290
2022200
2023320
202490
202590
2026 (through Aug 31, 2026)30

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

14 of its 308 interconnected installs (4.6% of the 305 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Mar 19, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.04514.8%not counted
NEM 2.024680.7%0 (0.0%)
Net Billing Tariff144.6%not recorded
Not recorded3

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on 180 Solar Power’s installs. No residential system in the file lists a third-party owner name that matches 180 Solar Power exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 6 of 180 Solar Power’s 13 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (3, 50.0%) used modules recorded as JA Solar.

In the last 24 months, 10 of 180 Solar Power’s 13 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (9, 90.0%) used inverters recorded as Tesla.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJA Solar3not in top list
Qcells284
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.1not in top list
JinkoSolar1not in top list
Inverter makerTesla99
SMA260
Enphase1101
PV Powered1not in top list
SolarEdge1150

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 259 of 308 installs, inverters on 305. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names 180 Solar Power as developer on 47 battery storage projects and as installer on 47 (47 name it as both), 47 projects in all with 625 kWh of storage. 23 have the status Paid, with $49,407 in current incentive allocations. Applications were received from Feb 16, 2021 to Oct 7, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid23284$49,407
Reserved110$1,440
Cancelled17254$74,589
RRF Rejected678$11,634

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage34418$58,81721$33,063
Large-Scale Storage482$21,0361$7,820
Equity Resiliency347$45,5841$8,523
Not stated678$11,6340$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
995321180 ROOFING PROS (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-39 Roofing Contractor; C-46 Solar ContractorAug 1, 2014Aug 31, 2028288

License numbers are the ones the utilities recorded on the interconnection applications (288 of 308 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 995321. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list 180 Solar Power’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County9953211654971212157

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego257
Riverside33
Orange14
San Bernardino4

Top cities

CityInstalls
San Diego70
Escondido62
Oceanside16
Vista16
San Marcos13
El Cajon12
Ramona10
Poway9
Carlsbad8
Chula Vista8
Corona6
Fallbrook6
La Mesa6
Santee6
Spring Valley6

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
180 Solar Power294
180 SOLAR POWER INC11
180 SOLAR POWER2
180 Solar POwer1

Common questions

Where does 180 Solar Power install solar?

Its installs are spread across 4 counties. The most are in San Diego County (257 installs), followed by Riverside County (33).

How often does 180 Solar Power install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many 180 Solar Power installs are under NEM 3.0 (the Net Billing Tariff)?

14 of its 308 interconnected installs (4.6% of the 305 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.