How many solar installs has CK Electric done in California, and which license number is on its installs?

CK Electric has 336 residential solar installs interconnected in California, active in the records from 2014 through 2022 (Jul 16, 2014 to Aug 12, 2022), most of them in San Diego County (264), Orange County (46) and Riverside County (14). CSLB lists license 354550 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jan 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
336
Last 24 months
0
Total capacity
2,251 kW DC
Median system size
6.2 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 325 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Jul 16, 2014
Latest install
Aug 12, 2022
Counties
6
Utilities
SDGE 305, SCE 31
CSLB license
354550

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
2014100
2015330
2016430
2017370
2018430
2019470
2020570
2021360
2022300
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 336 interconnected installs with a tariff recorded (336) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.08124.1%not counted
NEM 2.025575.9%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on CK Electric’s installs. No residential system in the file lists a third-party owner name that matches CK Electric exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 327 of CK Electric’s 336 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (133, 40.7%) used modules recorded as LG.

Across all years, 336 of CK Electric’s 336 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (210, 62.5%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG0133
Qcells057
Canadian Solar046
SolarWorld040
Hyundai015
Inverter makerEnphase0210
SolarEdge082
SMA042
Power-One02
Advanced Energy, Inc.01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 327 of 336 installs, inverters on 336. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
354550Sole owner license (name not shown)CLEARC-10 Electrical ContractorMar 23, 1978Jan 31, 2027285

License numbers are the ones the utilities recorded on the interconnection applications (286 of 336 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 354550. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list CK Electric’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County35455017812112019688109

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego264
Orange46
Riverside14
Los Angeles7
San Bernardino3
Ventura2

Top cities

CityInstalls
San Diego113
Escondido25
Fallbrook19
Ramona16
Vista12
Oceanside10
Poway10
San Clemente10
Carlsbad8
La Mesa8
Chula Vista7
El Cajon7
Dana Point6
Santee6
Jamul5

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CK Electric324
CK ELECTRIC7
ck electric5

Common questions

Where does CK Electric install solar?

Its installs are spread across 6 counties. The most are in San Diego County (264 installs), followed by Orange County (46).

How often does CK Electric install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many CK Electric installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 336 interconnected installs with a tariff recorded (336) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.