Daily Electric

How many solar installs has Daily Electric done in California, and which license number is on its installs?

Daily Electric has 169 residential solar installs interconnected in California, active in the records from 2004 through 2026 (May 24, 2004 to Jan 4, 2026), most of them in San Bernardino County (70), Los Angeles County (35) and Orange County (25). CSLB lists license 726186 (DAILY ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
169
Last 24 months
2
Total capacity
1,060.9 kW DC
Median system size
5.6 kW DC
With battery storage
1.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.8% of 119 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
3 installs, latest Jan 4, 2026
Ownership types recorded
other 1
Median battery size
10.1 kWh (3 installs list a capacity)
First install
May 24, 2004
Latest install
Jan 4, 2026
Counties
8
Utilities
SCE 164, SDGE 5
CSLB license
726186

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2004 to 2026

YearInstalls interconnectedWith battery storage
200410
200510
200680
2007320
2008130
2009180
2010220
201130
201240
2013120
201490
2015120
201670
201750
201840
201910
202030
202130
202241
202341
202411
202510
2026 (through Aug 31, 2026)10

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

3 of its 169 interconnected installs (1.8% of the 169 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 33.3% of those include battery storage. The latest Net Billing Tariff install was approved Jan 4, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.014585.8%not counted
NEM 2.02112.4%2 (9.5%)
Net Billing Tariff31.8%1 (33.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 1 of Daily Electric’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches Daily Electric exactly.

Third-party owner named on its installsInstalls
Solatron Technologies1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 2 of Daily Electric’s 2 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (1, 50.0%) used modules recorded as Aptos Solar.

In the last 24 months, 2 of Daily Electric’s 2 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 100.0%) used inverters recorded as Enphase.

In the last 24 months, none of Daily Electric’s 2 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

2 of 3 battery-paired PG&E and SCE installs (66.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerAptos Solar14
JA Solar1not in top list
Inverter makerEnphase252
Battery makerEnphase02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 39 of 169 installs, inverters on 164. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
726186DAILY ELECTRIC INC (Corporation)CLEARC-10 Electrical ContractorAug 13, 1996Jun 30, 2027163

License numbers are the ones the utilities recorded on the interconnection applications (164 of 169 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 726186. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
San Bernardino70
Los Angeles35
Orange25
Riverside20
Ventura8
Kern7
San Diego3
Santa Barbara1

Top cities

CityInstalls
Apple Valley12
Chino10
Redlands8
Upland7
Ridgecrest5
Barstow4
Corona4
Desert Hot Springs4
Huntington Beach4
Irvine4
La Habra Heights4
Riverside4
Tustin4
Alta Loma3
Chino Hills3

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
DAILY ELECTRIC94
Daily Electric30
DAILY ELECTRIC INC24
Daily Electric, Inc.20
Daily Electric, Inc1

Common questions

Where does Daily Electric install solar?

Its installs are spread across 8 counties. The most are in San Bernardino County (70 installs), followed by Los Angeles County (35).

How often does Daily Electric install batteries with solar?

1.8% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 2). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Daily Electric installs are under NEM 3.0 (the Net Billing Tariff)?

3 of its 169 interconnected installs (1.8% of the 169 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 33.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.