Elevation Solar

How many solar installs has Elevation Solar done in California, and which license number is on its installs?

Elevation Solar has 1,034 residential solar installs interconnected in California, active in the records from 2015 through 2026 (May 1, 2015 to Jun 18, 2026), most of them in Orange County (269), San Bernardino County (181) and San Diego County (171). CSLB lists license 1048076 (ELEVATION SOLAR LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Dec 31, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to Elevation Solar here carry more than one CSLB license number: 1048076 on 978 (CSLB holder ELEVATION SOLAR LLC, Chandler) and 902611 on 37 (CSLB holder Sole owner license (name not shown)), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
1,034
Last 24 months
6
Total capacity
7,932.2 kW DC
Median system size
7.2 kW DC
With battery storage
5.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 66.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.5% of 1,026 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
6 installs, latest Oct 17, 2024
Ownership types recorded
PPA 4, lease 1
Median battery size
10.1 kWh (40 installs list a capacity)
First install
May 1, 2015
Latest install
Jun 18, 2026
Counties
16
Utilities
SCE 734, SDGE 199, PGE 101
CSLB license
1048076, 902611

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
2015250
2016180
201720
201890
201960
2020190
20212192
202235211
202335721
2024248
202521
2026 (through Aug 31, 2026)11

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

6 of its 1,034 interconnected installs (0.6% of the 1,034 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Oct 17, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0434.2%not counted
NEM 2.098595.3%44 (5.5%)
Net Billing Tariff60.6%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 5 of Elevation Solar’s installs the utility recorded a third-party ownership type: PPA 4, lease 1, prepaid lease 0, other 0. Across all installers, 15 residential systems list a third-party owner name that matches Elevation Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Elevation Solar5

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 6 of Elevation Solar’s 6 installs name a module maker in the “Generator Manufacturer” fields, and most of those (4, 66.7%) used modules recorded as REC.

In the last 24 months, 6 of Elevation Solar’s 6 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (5, 83.3%) used inverters recorded as Enphase.

In the last 24 months, 4 of Elevation Solar’s 6 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (2, 50.0%) used batteries recorded as Tesla.

41 of 44 battery-paired PG&E and SCE installs (93.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC4447
Panasonic143
Qcells1450
SunPower1not in top list
Inverter makerEnphase5531
SolarEdge1305
SunPower191
Battery makerTesla210
ENHASE ENCHARGE 101not in top list
FranklinWH1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 978 of 1,034 installs, inverters on 1,034. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Elevation Solar as developer on 12 battery storage projects and as installer on 1 (1 name it as both), 12 projects in all with 254 kWh of storage. 2 have the status Paid, with $5,552 in current incentive allocations. Applications were received from Aug 6, 2021 to Mar 14, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid233$5,552
Cancelled8195$167,206
RRF Rejected226$5,280

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency8195$167,2060$0
Small Residential Storage233$5,5522$5,552
Not stated226$5,2800$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1048076ELEVATION SOLAR LLC (Limited Liability)CLEARC-10 Electrical ContractorDec 19, 2018Dec 31, 2026978
902611Sole owner license (name not shown)CLEARB General Building Contractor; C-46 Solar ContractorAug 27, 2007Sep 30, 202837

License numbers are the ones the utilities recorded on the interconnection applications (1,016 of 1,034 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for licenses 1048076, 902611. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Elevation Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2020202120222023Total
unincorporated San Diego County10480764417227

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Orange269
San Bernardino181
San Diego171
Riverside168
Los Angeles119
Santa Clara61
Ventura24
Alameda16
San Mateo8
Fresno6
Merced4
Contra Costa3
Butte1
Kern1
Santa Barbara1
Sonoma1

Top cities

CityInstalls
San Diego67
San Jose44
Irvine37
Huntington Beach24
Corona23
Mission Viejo23
Fontana22
Chula Vista18
Temecula18
Orange15
Victorville15
Laguna Niguel14
San Bernardino14
Murrieta13
Beaumont12

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ELEVATION SOLAR LLC798
Elevation Solar230
ELEVATION SOLAR6

Common questions

Where does Elevation Solar install solar?

Its installs are spread across 16 counties. The most are in Orange County (269 installs), followed by San Bernardino County (181).

How often does Elevation Solar install batteries with solar?

5.3% of its interconnected solar installs include battery storage across all years, and 66.7% in the last 24 months (4 of 6). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Elevation Solar installs are under NEM 3.0 (the Net Billing Tariff)?

6 of its 1,034 interconnected installs (0.6% of the 1,034 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.