Elite Solar

How many solar installs has Elite Solar done in California, and which license number is on its installs?

Elite Solar has 327 residential solar installs interconnected in California, active in the records from 2010 through 2026 (May 28, 2010 to Aug 20, 2026), most of them in Butte County (120), Orange County (84) and San Diego County (69). CSLB lists license 980283 (ELITE CONTRACTING SERVICES INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, D-63, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to Elite Solar here carry more than one CSLB license number: 980283 on 142 (CSLB holder ELITE CONTRACTING SERVICES INC, Ramona) and 930561 on 87 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
327
Last 24 months
29
Total capacity
2,740.8 kW DC
Median system size
7.6 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.0% of 326 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
21 installs, latest Aug 20, 2026
Ownership types recorded
none recorded
First install
May 28, 2010
Latest install
Aug 20, 2026
Counties
15
Utilities
PGE 165, SDGE 152, SCE 10
CSLB license
980283, 930561

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201070
201190
2012180
2013260
2014550
2015520
2016250
201730
201870
2019100
202060
2021140
2022190
2023380
2024130
2025160
2026 (through Aug 31, 2026)90

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

21 of its 327 interconnected installs (6.4% of the 327 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Aug 20, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.018556.6%not counted
NEM 2.012137.0%0 (0.0%)
Net Billing Tariff216.4%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Elite Solar’s installs. No residential system in the file lists a third-party owner name that matches Elite Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 27 of Elite Solar’s 29 installs name a module maker in the “Generator Manufacturer” fields, and most of those (22, 81.5%) used modules recorded as Qcells.

In the last 24 months, 29 of Elite Solar’s 29 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (26, 89.7%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells2291
LONGi4not in top list
JinkoSolar1not in top list
Inverter makerEnphase26185
SolarEdge321
Generac1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 318 of 327 installs, inverters on 327. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
980283ELITE CONTRACTING SERVICES INC (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; D-63Jan 12, 2013Jun 30, 2027142
930561Not found in the CSLB License Master file pulled Nov 4, 202687

License numbers are the ones the utilities recorded on the interconnection applications (231 of 327 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 980283. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Elite Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County98028341071121435163120

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Butte120
Orange84
San Diego69
Colusa12
Sutter10
Glenn7
Los Angeles5
Placer5
Yuba4
Tehama3
Ventura3
Yolo2
El Dorado1
Riverside1
Solano1

Top cities

CityInstalls
Ramona82
Chico47
Oroville35
San Diego19
Durham12
El Cajon10
Poway8
Paradise7
Biggs6
Lakeside6
San Marcos6
Gridley5
Richvale5
Colusa4
Escondido4

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Elite Solar317
ELITE SOLAR8
Elite solar1
Elite Solar Inc.1

Common questions

Where does Elite Solar install solar?

Its installs are spread across 15 counties. The most are in Butte County (120 installs), followed by Orange County (84).

How often does Elite Solar install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Elite Solar installs are under NEM 3.0 (the Net Billing Tariff)?

21 of its 327 interconnected installs (6.4% of the 327 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.