Equisolar Inc

How many solar installs has Equisolar Inc done in California, and which license number is on its installs?

Equisolar Inc has 266 residential solar installs interconnected in California, active in the records from 2015 through 2024 (Dec 8, 2015 to Dec 17, 2024), most of them in Kern County (45), Fresno County (41) and Los Angeles County (26). The license number recorded on most of its installs, 1006535, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
266
Last 24 months
1
Total capacity
1,269.3 kW DC
Median system size
3.8 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.0% of 266 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Dec 8, 2015
Latest install
Dec 17, 2024
Counties
40
Utilities
PGE 214, SCE 45, SDGE 7
CSLB license
1006535, 243239

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201510
2016940
2017870
2018620
2019150
202030
202100
202200
202330
202410
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 266 interconnected installs with a tariff recorded (266) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.09836.8%not counted
NEM 2.016863.2%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Equisolar Inc’s installs. No residential system in the file lists a third-party owner name that matches Equisolar Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of Equisolar Inc’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as Canadian Solar.

In the last 24 months, 1 of Equisolar Inc’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar115
Inverter makerSolarEdge137

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 254 of 266 installs, inverters on 266. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1006535Not found in the CSLB License Master file pulled Nov 4, 2026242
243239Not found in the CSLB License Master file pulled Nov 4, 202614

License numbers are the ones the utilities recorded on the interconnection applications (266 of 266 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list Equisolar Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192023Total
City and County of San Francisco10065351012
unincorporated San Diego County10065350011
unincorporated Marin County10065350101

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Kern45
Fresno41
Los Angeles26
Tulare17
Sonoma15
Santa Clara11
Contra Costa8
San Bernardino7
San Diego7
Solano7
Yolo7
Kings6
Madera6
Alameda5
San Joaquin5
Butte4
Mariposa4
Merced4
Riverside4
Tehama4
Humboldt3
Mendocino3
Colusa2
Glenn2
Lake2
Napa2
Placer2
San Francisco2
Santa Barbara2
Shasta2
Yuba2
Calaveras1
Monterey1
Nevada1
Orange1
San Benito1
San Luis Obispo1
Santa Cruz1
Sutter1
Tuolumne1

Top cities

CityInstalls
Bakersfield28
Fresno15
Dinuba10
San Jose6
Santa Rosa6
Arvin5
Coalinga5
Lancaster5
Reedley5
Richmond5
Lamont4
Madera4
Mariposa4
Orange Cove4
Sanger4

Names as recorded by the utilities

The utilities recorded this installer under 14 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Equisolar Inc92
Equisolar78
EQUISOLAR INC34
Equisolar Inc.16
equisolar12
Equisolar, INC8
Equisolar, Inc.7
EQUISOLAR5
Equisolar, Inc4
equisolar inc3
Equisolar inc2
Equisolar INC2
Equisolar INC.2
Equisolar INc1

Common questions

Where does Equisolar Inc install solar?

Its installs are spread across 40 counties. The most are in Kern County (45 installs), followed by Fresno County (41).

How often does Equisolar Inc install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Equisolar Inc installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 266 interconnected installs with a tariff recorded (266) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.