Family First Solar Electric has 342 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Jun 28, 2018 to Apr 23, 2026), most of them in San Diego County (321), Orange County (13) and Riverside County (8). CSLB lists license 1015473 (FAMILY FIRST SOLAR ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jan 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
342
Last 24 months
19
Total capacity
1,882.2 kW DC
Median system size
4.8 kW DC
With battery storage
33.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 50.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 342 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
39 installs, latest Apr 23, 2026
Ownership types recorded
none recorded
Median battery size
10 kWh (3 installs list a capacity)
First install
Jun 28, 2018
Latest install
Apr 23, 2026
Counties
3
Utilities
SDGE 333, SCE 9
CSLB license
1015473

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
2018100
2019210
2020460
2021450
2022580
20231201
2024312
202580
2026 (through Aug 31, 2026)30

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

39 of its 342 interconnected installs (11.4% of the 342 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.7% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Apr 23, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.030388.6%1 (16.7%)
Net Billing Tariff3911.4%2 (66.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Family First Solar Electric’s installs. No residential system in the file lists a third-party owner name that matches Family First Solar Electric exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 18 of Family First Solar Electric’s 19 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (8, 44.4%) used modules recorded as UnitedRenewableEnergyCo.,Ltd..

In the last 24 months, 19 of Family First Solar Electric’s 19 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (17, 89.5%) used inverters recorded as Enphase.

In the last 24 months, 1 of Family First Solar Electric’s 19 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Enphase.

3 of 3 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerUnitedRenewableEnergyCo.,Ltd.886
LONGi3not in top list
Trina Solar2not in top list
United Renewable Energy2not in top list
Aptos Solar1not in top list
Inverter makerEnphase17330
Tesla23
LG1not in top list
Battery makerEnphase12

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 326 of 342 installs, inverters on 342. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Family First Solar Electric as developer on 2 battery storage projects and as installer on 2 (2 name it as both), 2 projects in all with 19 kWh of storage. 1 have the status Paid, with $1,456 in current incentive allocations. Applications were received from Jul 22, 2021 to Jun 23, 2022.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid110$1,456
Cancelled110$9,706

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency110$9,7060$0
Small Residential Storage110$1,4561$1,456

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1015473FAMILY FIRST SOLAR ELECTRIC INC (Corporation)CLEAR, WC Susp PendingC-10 Electrical ContractorJun 24, 2016Jan 31, 2027342

License numbers are the ones the utilities recorded on the interconnection applications (342 of 342 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1015473. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Family First Solar Electric’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019202020212022202320242025Total
unincorporated San Diego County1015473271177257268

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego321
Orange13
Riverside8

Top cities

CityInstalls
San Diego169
Chula Vista53
Spring Valley17
Ramona11
Escondido10
Bonita9
Oceanside8
El Cajon6
Encinitas6
La Mesa6
National City5
San Ysidro5
Vista4
Carlsbad3
San Marcos3

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Family First Solar Electric333
FAMILY FIRST SOLAR ELECTRIC INC5
FAMILY FIRST SOLAR ELECTRIC4

Common questions

Where does Family First Solar Electric install solar?

Its installs are spread across 3 counties. The most are in San Diego County (321 installs), followed by Orange County (13).

How often does Family First Solar Electric install batteries with solar?

33.3% of its interconnected solar installs include battery storage across all years, and 50.0% in the last 24 months (1 of 2). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Family First Solar Electric installs are under NEM 3.0 (the Net Billing Tariff)?

39 of its 342 interconnected installs (11.4% of the 342 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.7% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.